陕西Harbin Taiping International Airport B11-B13 B taxiway reconstruction project - runway and visual navigation assistance project bidding announcement

CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view

To view hidden content (*), please log in first

1. Bidding conditions: The reconstruction project of taxiway B between B11-B13 of Harbin Taiping International Airport has been approved for construction by the Northeast Civil Aviation Administration of China in accordance with the "Letter of Industry Review Opinions on the Preliminary Design of taxiway B Reconstruction Project between B11-B13 of Harbin Taiping International Airport" (Civil Aviation Northeast Administration Letter [2025] No. 45), and by Heilongjiang Airport Management Group Co., Ltd. in accordance with the "Reply on the Preliminary Design and Budget of taxiway B Reconstruction Project between B11-B13 of Harbin Taiping International Airport" (Black Airport Group [2025] No. 49). The project owner is Heilongjiang Airport Management Group Co., Ltd., and the construction funds come from self raised funds. The tenderer is Heilongjiang Airport Management Group Co., Ltd. This project has met the bidding conditions and is now open for bidding and procurement. 2. Project Overview and Bidding Scope 2.1 Project Name: Reconstruction Project of taxiway B between B11-B13 of Harbin Taiping International Airport - Runway and Visual Navigation Assistance Engineering 2.2 Bidding Number: DFA-BS05-DL-202503612.3 Construction Location: Harbin Taiping International Airport 2.4 Bidding Scope: Runway Engineering: Repainting 40cm thick cement concrete surface layer, with an area of approximately 27500 square meters, and using geotextile for isolation layer; Spray pavement protection agent (impregnated with silane) on the reconstructed area and restore the pavement marking line; Reconstruct the pavement and mill the adjacent asphalt concrete pavement area, and re lay 6cm thick asphalt concrete with an area of approximately 8950 square meters. Assistive lighting engineering: Combining future runway and smooth overhaul projects, pre embed auxiliary lighting facilities. Please refer to the drawings and bill of quantities for details. 2.5 Planned construction period: 50 calendar days. 3. Qualification Requirements for Bidders 3.1 Qualification Requirements for Bidders: (1) Bidders must be legal persons or other organizations officially registered within the territory of the People's Republic of China and have valid independent legal person qualifications, and provide a copy of their business license and public information from the National Enterprise Credit Information Publicity System (stamped with the bidder's official seal). (2) Bidders must possess both Level 2 or above qualifications for specialized contracting of airport runway engineering and Level 2 or above qualifications for specialized contracting of airport visual navigation assistance engineering issued by the competent construction administrative department, as well as a valid safety production license. 3.2 Qualification of Project Manager: The proposed project manager must hold a national first-class registered constructor certificate (for civil aviation airport engineering) and a valid safety production assessment certificate (B certificate). If the proposed project manager has other ongoing projects, they must comply with the requirements of the "Notice of the Airport Department of the Civil Aviation Administration of China on Further Clarifying the Opinions of Registered Constructors as Construction Project Leaders". 3.3 The main person in charge of the bidder must have a valid safety production assessment certificate (A certificate), and this project must have at least one full-time safety production management personnel with a valid safety production assessment certificate (C certificate). 3.4 Credit requirements: (1) Not being“ Credit China; The website (www.creditchina. gov.cn) has been included in the list of serious dishonest entities. (Provide a screenshot of the website after the release date of the bidding announcement and stamp it)
View hidden content