广西Bidding Announcement for Landscape Engineering Construction in Jiaotou and Shunqing Yuntai Region

CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view

To view hidden content (*), please log in first

1. Bidding conditions: This bidding project has been approved for construction by the Development and Reform Bureau of Liangqing District, Nanning City at 2307-450108-04-01-667215. The bidder is Guangxi Ruiqi Real Estate Development Co., Ltd. The construction funds are self raised by the enterprise, and the project investment ratio is 100%. The project has met the bidding conditions. Now, the construction of the landscape engineering of this project is open for bidding. 2. Project Overview and Bidding Scope 2.1 Project Bidding Number: JTHSQYT-GZ-028 (2025) 2.2 Construction Location: No. 21 Lutan Road, Liangqing District, Nanning City. 2.3 Construction Scale: The total land area of this project is 63081.60 square meters (approximately 94 acres), with a total construction area of 246734.33 square meters, including a capacity building area of 189244.68 square meters. The scope of this bidding is for the construction of the landscape project in Jiaotou and Shunqing Yuntai Greater Area. The landscape area is approximately 39600 square meters (excluding exhibition areas 5 #, 6 #, 7 #, and 13 #), including a kindergarten area of 4700 square meters and a remaining area of 34900 square meters, including a hard landscape area of approximately 16900 square meters and a soft landscape area of approximately 22700 square meters. 2.4 Estimated contract price: Approximately 21.53 million yuan 2.5 Required construction period: The total construction period is 250 calendar days, and the project will be implemented in three batches. The first batch: construction period for buildings 5 #, 12 #, 15 #, 16 #, 19 # and the municipal area outside the red line is 70 calendar days; Second batch: Construction period of 90 calendar days within the scope of buildings 2 #, 3 #, 17 #, 18 #, 20 #, and kindergarten; The third batch: The construction period within the scope of buildings 1 #, 8 #, 9 #, 10 #, and 11 # is 90 calendar days (the employer may adjust the implementation scope and time according to project development needs, subject to the final issuance of the commencement order, and the total construction period remains unchanged). 2.6 Scope of Tender: Construction of Landscape Engineering in Jiaotou and Shunqing Yuntai Region, including but not limited to hard paving (including wooden works, wall and ground paving, retaining walls, fences, benches, entrance paths, scenic spots, scenic walls, children's facilities, fitness facilities, railings, canopies, water features, garden roads, pedestrian roads, parking spaces, stone paving, etc.), soft landscape greening (including planting soil backfilling, planting site shaping, rectification, pre construction preparation of planting parts (including planting materials and sowing materials), water and electricity installation (including water and electricity pipelines, equipment, lighting installation, material supply and commissioning within the scope of the project, green space water supply and drainage pipelines, equipment, etc.), landscape ornaments (including water method, sculpture, etc.) Landscape iron art, landscape signage, landscape imitation stone paint, landscape components, landscape art gallery, etc All contents on landscape engineering drawings, including outdoor landscape soft decoration engineering, decorative manhole covers, ground spraying, marking, kindergarten, finished product protection, etc. For specific details, please refer to the construction drawings, bill of quantities, and bidding documents. 2.7 Section Division: 1 Section 3. Qualification Requirements for Bidders 3.1 This bidding requires bidders to have a valid business license, a registered capital of not less than 10 million yuan, and corresponding construction capabilities in personnel, equipment, funds, and other aspects. Among them, the bidder's proposed project manager must
View hidden content