广东Baiyun District Dongping Automobile Town Phase II AB2201088 Plot Development Project _ Baiyun District Dongping Automobile Town Phase II AB2201088 Plot Development Project Full Process Consulting Services (Supervision, Cost) Tender Announcement
CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view
To view hidden content (*), please log in first
Bidding Announcement for Full Process Consulting Services (Supervision, Cost) of AB2201088 Plot Development Project in Dongping Automobile Town Phase II, Baiyun District [Electronic Bid] Investment Project Code 2312-440111-04-01-248792 Investment Project Name: AB2201088 Plot Development Project in Dongping Automobile Town Phase II, Baiyun District Bidding Project Name: AB2201088 Plot Development Project in Dongping Automobile Town Phase II, Baiyun District Full Process Consulting Services (Supervision, Cost) Section (Package) Name: AB2201088 Plot Development Project in Dongping Automobile Town Phase II, Baiyun District Qualification Review Method: Qualification Review Bidding Project Implementation (Delivery) Location: East of Yongping Street to Guangcong 1st Road, Metro No. 14 East side of Exit A at Dongping Station. The source of funds is state-owned or collective investment, which constitutes 100.00% of the bidding scope and scale. The planned land area for plot AB2201088 of this project is 18021 square meters, with a total construction area of 68783.80 square meters; The calculated area is 45699.00 square meters (office 35259.20 square meters, commercial 9139.80 square meters, library 1200 square meters, public restroom 100 square meters), excluding 23084.80 square meters (basement 18042.09 square meters, elevated floor and other 5042.71 square meters), with a plot ratio of 4.0; The maximum building height is ≤ 90 meters, the building density is 50%, and the green space ratio is 25%. The foundation design grade of this project is Class A, and Class IV leveling measurement is adopted. (The final approval from the government regulatory department and the planning and construction management department shall prevail). The bidding content includes full process consulting services for the development project of AB2201088 plot in Dongping Automobile Town Phase II, Baiyun District (including engineering supervision and cost consulting), including but not limited to the following work contents (see the contract terms and requirements of the client for details): (1) Engineering supervision services: including engineering supervision (including pipeline relocation, temporary construction water, temporary construction electricity, engineering survey site, engineering construction supervision, etc.), engineering completion stage (including engineering completion acceptance and completion acceptance data transfer to urban construction archives, rectification, engineering transfer and physical transfer, engineering settlement, completion filing, final settlement, etc.), and engineering quality warranty stage supervision. Including quality control, occupational health and safety, environmental supervision and management, progress control, investment control, safety production supervision and management, contract management, information management, and coordination of work relationships between the construction unit and relevant parties during the supervision service period. (2) Cost consulting services: Full process cost consulting services (including cost control, consulting services, and cooperation with the tenderer to handle the highest bidding price record on the Guangzhou cost information system in various stages of the bidding project, such as the pre construction stage, design stage, bidding stage, construction stage, completion acceptance stage, settlement stage, etc.). The construction period (delivery time) starts from the date of signing the consulting service contract for the entire process of this project and ends on the date when the warranty period of this project ends and the project settlement is completed. Maximum bidding price (10000 yuan) 394.321571. Do you accept joint bidding