广东New Street River and Tianma River Baiyun Section Prevention and Standardization Standard Improvement Project - Construction General Contracting of New Street River and Tianma River Baiyun Section Embankment Standardization Standard Improvement Project
CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view
To view hidden content (*), please log in first
New Street River and Tianma River Baiyun Section Embankment Standardization and Standard Improvement Project Construction General Contracting [Electronic Standard] Investment Project Code 2406-440111-17-01-208359 Investment Project Name New Street River and Tianma River Baiyun Section Prevention Standardization and Standard Improvement Project Bidding Project Name New Street River and Tianma River Baiyun Section Embankment Standardization and Standard Improvement Project Construction General Contracting Section (Package) Name New Street River and Tianma River Baiyun Section Embankment Standardization and Standard Improvement Project Construction General Contracting Announcement Nature Normal Qualification Review Method Qualification Post review Bidding Project Implementation (Delivery) Location Jianggao Town, Baiyun District, Guangzhou City Financial Source of Funds Composition of District Financial Funds (100%) Bidding Scope and Scale This project is aimed at preventing current damage, collapse, and loss. Rebuilding the wave wall and constructing a wave resistant wall with a length of approximately 378.8 meters; Reconstruction of the collapsed embankment retaining wall, approximately 65 meters in length; Hardening the embankment top road, with a construction length of approximately 6219.9 meters; Renovation of approximately 1759.1 meters of existing concrete roads; Based on the current situation, about 16 traffic restricted elevated road piers are arranged, about 61 boundary markers are arranged along the line, and about 628 traffic signs, warning signs along the river, guidance signs along the river, name signs, announcement signs along the river, and management scope signs are arranged; About 36 new displacement monitoring facilities and seepage detection facilities will be built; Repair and reinforce 6 embankment crossing buildings along the route, including the Nanpu Xiawei drainage station; Flatten and weed the embankment slopes along the entire line, covering an area of approximately 204640 square meters. The total investment of this project is 60.4365 million yuan. The embankment level of this project is level 2, corresponding to level 2 for the main buildings, level 3 for the secondary buildings, and level 4 for the temporary buildings. The flood standard during the construction period is once every 5 years. The bidding content for this project involves the reconstruction of damaged, collapsed, and missing wave walls, with a total length of approximately 378.8 meters; Reconstruction of the collapsed embankment retaining wall, approximately 65 meters in length; Hardening the embankment top road, with a construction length of approximately 6219.9 meters; Renovation of approximately 1759.1 meters of existing concrete roads; Based on the current situation, about 16 traffic restricted elevated road piers are arranged, about 61 boundary markers are arranged along the line, and about 628 traffic signs, warning signs along the river, guidance signs along the river, name signs, announcement signs along the river, and management scope signs are arranged; About 36 new displacement monitoring facilities and seepage detection facilities will be built; Repair and reinforce 6 embankment crossing buildings along the route, including the Nanpu Xiawei drainage station; Flatten and weed the embankment slopes along the entire line, covering an area of approximately 204640 square meters. The total investment of this project is 60.4365 million yuan. The embankment level of this project is level 2, corresponding to level 2 for the main buildings, level 3 for the secondary buildings, and level 4 for the temporary buildings. The flood standard during the construction period is once every 5 years. (Specific job responsibilities can be found in the bidding drawings and bill of quantities) Construction period (delivery time) 180 calendar days Maximum bidding price (in 10000 yuan) 4586.482493 Whether to accept consortium bidding is a requirement for bidding qualification and ability. Bidder qualification requirements: 3. Bidder qualifications