广东Guangzhou Zhidu New Energy Co., Ltd. Xinnan CNC Industrial Park 2.2MW Roof Distributed Photovoltaic Project
CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view
To view hidden content (*), please log in first
Bidding Announcement for 3.30MW Distributed Photovoltaic Power Generation Project of Guangzhou Xinnan CNC Technology Co., Ltd. [Electronic Bid] Investment Project Code 2410-44015-01-01-162481; 2503-440115-04-01-732291 Investment Project Name: Guangzhou Zhidu New Energy Co., Ltd. Xinnan CNC Industrial Park 2.2MW Roof Distributed Photovoltaic Project; Guangzhou Zhidu New Energy Co., Ltd. Xinnan CNC Industrial Park 0.31MW roof distributed photovoltaic project bidding project name Guangzhou Xinnan CNC Technology Co., Ltd. 3.30MW distributed photovoltaic power generation project section (package) name Guangzhou Xinnan CNC Technology Co., Ltd. 3.30MW distributed photovoltaic power generation project announcement nature normal qualification review method qualification post review bidding project implementation (delivery) location: No. 62 Dachong Road, Nansha District, Guangzhou City. The roof funding source of the building owned by Guangzhou Xinnan CNC Technology Co., Ltd. The self raised funding source constitutes 100% of the self raised funding bidding scope and scale. (1) Engineering design: All design work involved in the construction scope of this project, including but not limited to the scheme design of the entire distributed photovoltaic power station involved in the project, and providing application for construction. Required engineering drawings and data, preliminary design, Provide supporting design services such as construction drawing design, construction drawing review, on-site service, coordination with construction and acceptance processes, scheme optimization and design changes (including estimation) during the construction process, participation in material and equipment sample finalization and inspection, and equipment customization based on the construction scope and limit; Full process design services and coordination work (including dispatching design representatives to provide on-site services); Cooperate with the construction drawing review work, and assist the tenderer in handling planning and construction applications, various professional applications and preliminary design reviews, obtaining construction project planning permits and other approval and construction work, coordinating the construction and acceptance process, reviewing and stamping completion drawings, etc. (2) Based on the proposed total project capacity, complete the procurement, construction, and acceptance within the scope of the project bidding through a fixed comprehensive unit price including tax, including but not limited to completing all construction work required for the entire distributed photovoltaic power station involved in this project (including construction preparation, labor, materials, construction period, quality, safety production, civilized construction, labor insurance, traffic evacuation for surrounding residents during the construction period, social security that the contractor should purchase, construction contracting management, and overall on-site organization, professional coordination and cooperation, project acceptance and handover within the contracting scope, construction drawing budget preparation, completion drawing preparation, settlement preparation, cooperation with relevant departments for settlement review (if any), and organization of the project. Acceptance filing and engineering data collection, organization and archiving work Engineering warranty and other related work. (3) This project is a turnkey project, and the winning bidder is responsible for the roof load report within the project scope (only applicable to color steel tile roofs, if it does not meet the requirements of photovoltaic construction, a reinforcement plan should be issued and the reinforcement project should be completed), supply, construction and acceptance, and third-party system performance index testing. Even if it is not specified within the scope of this project, if it is actually proven to be necessary to ensure the power generation and operation of the project, it must be included in the scope of procurement, installation and service provision. The bidding content project is located at No. 62 Dachong Road, Nansha District, Guangzhou, China