山东Shandong Road and Bridge Group Co., Ltd. SDLQ2025GC106025 Other Direct Selection Procurement Announcement

CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view

To view hidden content (*), please log in first

Chapter 1 Procurement Announcement 1. Procurement Method: This procurement method is: direct selection. 2. Procurement Reason: Due to the project construction involving cross river operations, according to the requirements of the water resources department, reinforcement and expansion of embankments and other river protection projects need to be carried out in order to manage flood prevention in the upstream and downstream river sections of the bridge site and timely deal with dangerous situations. Huimin County Urban and Rural Water Bureau recommends in writing that Shandong Longen Construction Engineering Co., Ltd. carry out river protection engineering construction in our section. After investigation by the project department, the company meets the qualification requirements of water conservancy and hydropower level three or above, and its personnel, machinery, and construction capabilities can meet the construction requirements of the river protection project in Jibin. According to the management regulations of the group company, it is proposed to directly select and complete the procurement of river protection for this project. 3. Procurement Content and Scope (1) Project Overview Package 1: The JBTJ-5 section of the newly built Jinwei High speed Railway Jinan Connection Line is located in Huimin County, Binzhou City. It starts from DK99+804.66 and crosses Provincial Highway S239, Bojili Main Canal, Provincial Highway S246, and Shahe in sequence to establish Huimin Station on the north side of Sunding Village. After leaving the station, it crosses Shahe, Provincial Highway S247 (Binhui Avenue), and partially crosses Xincheng Agricultural Area to the design endpoint DK125+832.78 of this section. The main line is divided into a section: DK99+804.66-DK125+832.78, The length of the line is 26.0281km. Main engineering quantities: The main line bridge is 26028.12 meters long, with 766 prefabricated and erected simply supported beams, 13 special structures (continuous beams), and 7 cast-in-place simply supported box girders; 30 hole simply supported box girder for cast-in-place station platform bridge; Liangchang 1, etc. Planned contract duration: The planned start date is September 2022, the planned completion date is September 2026, and the duration is 48 months. (2) The procurement scope is divided into one package, and the specific information is shown in the table below. Table 1-1 Package Information Table Package Number Package Name Job Content and Description Proposed Selection Quantity Remarks Package 1: River Protection Engineering for Section 5 of the Jinwei High speed Railway This package is the river protection engineering for the Jinwei High speed Railway Section 5 project, mainly including earthwork excavation, earthwork backfilling, concrete tooth wall, slope protection tooth wall, concrete wall body and foundation, concrete support wall and other related operations. 1. Total 14. Qualification Requirements for Candidates (1) Qualification Requirements Table 1-2 Applicable Package Qualification Requirements Package 1 (1) The candidate should be a registered and qualified labor service unit of Shandong Expressway and Bridge Group Co., Ltd., with a good corporate reputation. If the candidate intends to participate in this procurement, they should go to the full process digital procurement platform of Shandong Road and Bridge Group Co., Ltd. in advance( http://caigou.sdluqiao.com:8086/ )Complete online registration and information maintenance. (2) Having independent legal personality and holding a valid business license. (3) We do not accept consortia. (4) The package qualification meets one of the following requirements: Level 3 or above qualification for professional contracting of river and lake remediation engineering or Level 3 or above qualification for water conservancy and hydropower (5) has not been included in the list of dishonest persons subject to enforcement in "Credit China" and has no administrative penalties (6) has a valid safety production license (2) each candidate can participate in the election of up to 2 packages, only allowed
View hidden content