北京Announcement on Competitive Selection of a Batch of Consumables such as Vacuum Blood Collection Tubes
CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view
To view hidden content (*), please log in first
Chongqing Tongcheng Engineering Project Management Consulting Co., Ltd. adopts a competitive selection method to purchase a batch of consumables projects such as vacuum blood collection tubes. Welcome suppliers who meet the qualification requirements and have supply capabilities to actively participate. 1、 Basic project information (total project budget: 86001.44 yuan, price type: total price, professional field: medical equipment, drugs, consumables, etc.) Package 1 (number of subject matter: 1) Package total: 86001.44 yuan Catalog/demand description, unit price, limit quantity, subtotal (yuan) Catalog: other medical equipment demand description, please refer to the comparison document 86001.44 yuan 1 (batch) 86001.44 yuan 2. Supplier qualification requirements (Suppliers participating in bidding (quotation) must register on the "Xingcaijia" service platform and become formal suppliers.) (1) Ability to independently assume civil liability (2) Good business reputation and sound financial accounting system (3) Necessary equipment and professional technical ability to fulfill contracts (4) Good record of paying taxes and social security funds in accordance with the law (5) No major illegal records in business activities within the three years before participating in government procurement activities (3) Bid (quotation) time Bid (quotation) start time: April 18, 2025 9:00:00 (Beijing) Bid (quotation) deadline: April 18, 2025 11:00:00 (Beijing) 4. No bid security deposit (5) Bid (response) document requirements Document must be uploaded: Yes Document upload instructions: (1) Sign and number of response documents (1) Response document One copy of the document. (2) Each page of the response document should be stamped with an official seal (the signature and seal specified in the response document format must be signed and stamped according to its regulations), otherwise it will be treated as an invalid mark. (3) If the supplier makes necessary modifications to the errors in the response document, they should affix the supplier's official seal or have the legal representative or authorized representative sign and confirm the modifications. Otherwise, they will be treated as invalid. (2) The cover label of the response document requires that the project name, project number, supplier name, and the words "response document" should be indicated on the cover of the response document, and the supplier's official seal should be affixed on the cover. Otherwise, it will be treated as an invalid label. 6、 Business terms (1) Delivery time: Prior to the signing of the contract, the purchaser has the right to request a trial of the products from the proposed supplier. If the trial is qualified, the contract will be signed. The contract period for this project is 3 years. After signing the contract, supply will be made in batches according to the purchaser's requirements. (2) Delivery location: Designated location of Bishan District People's Hospital in Chongqing. (3) Inspection method: 1. After the goods arrive at the site, the contracted supplier should open the box in the presence of personnel from the user unit, jointly count and inspect the appearance, and accept according to relevant national and industry standards. Both parties should sign and confirm. 2. The successful supplier shall ensure that the goods arrive at the purchaser's location intact and undamaged. If there are any omissions or damages, the successful supplier shall be responsible for replacement, supplementation or compensation. 3. The successful supplier shall provide product qualification certificates and batch testing reports in accordance with relevant national documents. 4. If the goods provided by the successful supplier do not meet the requirements of the competitive selection document and cause losses to the purchaser, the successful supplier shall bear all responsibilities and compensate for the losses incurred