北京Announcement on Competitive Selection of Equipment such as Ultra Short Wave Therapy Machines

CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view

To view hidden content (*), please log in first

Chongqing Tongcheng Engineering Project Management Consulting Co., Ltd. adopts a competitive selection method to purchase a batch of equipment such as ultra short wave therapy machines. Welcome suppliers who meet the qualification requirements and have supply capabilities to actively participate. 1、 Basic project information (total project budget: 430000.00 yuan, price type: total price, professional field: medical equipment, drugs, consumables, etc.) Package 1 (number of subject matter: 1) Package total: 430000.00 yuan Catalog/requirement description, unit price, limit quantity, subtotal (yuan) Catalog: other medical equipment requirement description, please refer to the comparison document 430000.00 yuan 1 (batch) 430000.00 yuan 2. Supplier qualification requirements (Suppliers participating in bidding (quotation) must register on the "Xingcaijia" service platform and become formal suppliers.) (1) Ability to independently assume civil liability (2) Good business reputation and sound financial accounting system (3) Necessary equipment and professional technical ability to fulfill contracts (4) Good record of paying taxes and social security funds in accordance with the law (5) No major illegal records in business activities within the three years before participating in government procurement activities (3) Bid (quotation) time Bid (quotation) start time: April 18, 2025 9:00:00 (Beijing) Bid (quotation) deadline: April 18, 2025 11:00:00 (Beijing) 4. No bid security deposit (5) Bid (response) document requirements Document must be uploaded: Yes Document upload instructions: (1) Sign and number of response documents (1) Response document One copy of the document. (2) Each page of the response document should be stamped with an official seal (the signature and seal specified in the response document format must be signed and stamped according to its regulations), otherwise it will be treated as an invalid mark. (3) If the supplier makes necessary modifications to the errors in the response document, they should affix the supplier's official seal or have the legal representative or authorized representative sign and confirm the modifications. Otherwise, they will be treated as invalid. (2) The cover label of the response document requires that the project name, project number, supplier name, and the words "response document" should be indicated on the cover of the response document, and the supplier's official seal should be affixed on the cover. Otherwise, it will be treated as an invalid label. 6、 Business terms (1) Delivery time: Within 30 days after the contract is signed, complete the delivery, installation, and commissioning of all products for this project. (2) Delivery location: Designated location of Bishan District People's Hospital in Chongqing (III) Inspection method: 1. The successful supplier shall deliver the goods to the designated location of the purchaser free of charge. The purchaser shall open the box on the spot, conduct joint counting, inspect the appearance, etc. for unpacking and acceptance, and both parties shall sign and confirm before installation, commissioning, free training and technical guidance can be carried out. 2. The supplier shall ensure that the goods arrive in good condition at the purchaser's location and are brand new products with a production date of less than 1 year. If there are any omissions or damages, the supplier shall be responsible for replacement, supplementation or compensation. 3. The successful supplier shall dispatch professional technical personnel to provide free professional training on equipment use and operation to the purchaser's designated location, enabling them to operate normally. 4. After all lines and equipment have been used normally and tested for one month, the technical engineering personnel of the successful supplier (if not authorized personnel of this project, they must be separately
View hidden content