内蒙古EPC (Engineering, Procurement, and Construction) of the Green Park Photovoltaic Project of Inner Mongolia Baogang Xichuang Group Co., Ltd

CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view

To view hidden content (*), please log in first

Tender Notice for EPC of Green Park Photovoltaic Project of Inner Mongolia Baogang Xichuang Group Co., Ltd. (Tender No.: HT2025SG-08) I. Tender Conditions: The EPC of Green Park Photovoltaic Project of Inner Mongolia Baogang Xichuang Group Co., Ltd. has met the tender conditions, and the required funds for the project are self raised by the enterprise. Inner Mongolia Haitong Engineering Project Management Co., Ltd. is entrusted by the Distributed Photovoltaic Power Generation Project Construction Management Office of Baotou Jiaotou Mingyang New Energy Co., Ltd. and is now conducting an open tender for the project. 2、 Project Overview and Bidding Scope 1. The construction location of this bidding project is Xichuang Industrial Park and Baogang Cold Storage of Baogang Xichuang Group Co., Ltd. in Inner Mongolia. 2. Project scale: The designed installation capacity of this project is 0.887MW on the AC side and 0.9394MWp on the DC side. 3. Scope and content of bidding: Design, equipment, and construction general contracting. The work content includes all the work involved in the project scope, including design, equipment procurement and supply, installation, commissioning, and construction, handling of power grid access procedures, testing of power quality, handover testing, and all related technical services, after-sales services, and defect elimination services during the warranty period. Design: including but not limited to on-site survey, construction drawing design, rendering design, completion drawing drawing, construction drawing, design technical disclosure, solving design technical problems during construction, subsequent technical services and design consulting work, and completion acceptance, all design work content. Equipment: Procurement, transportation, unloading, secondary handling, and storage of all equipment and materials required to complete the project. Installation, commissioning and construction: all civil engineering construction, equipment installation, testing and commissioning on site. Note: This project is a turnkey project, and bidders must be responsible for all works, goods, and services within the scope of the project bidding. Even if not specified in the bidding scope, if it is actually proven to be necessary to ensure the power generation and operation of this project, it must be included in the scope of design, procurement, installation, and service provision. Before delivery and operation, it must comply with the relevant acceptance standards for photovoltaic power generation and meet the requirements for grid connection in the project location. 4. This project is divided into one section. Project name: Bidding scope: Construction period (days). Planned investment: Inner Mongolia Baogang Xichuang Group Co., Ltd. Green Park Photovoltaic Project Engineering General Contracting (EPC). The EPC (including design, procurement, and construction) under this project has a construction period of 45 calendar days (accurate construction period is based on the date of signing the construction contract), and a design service period of 15 calendar days (accurate construction period is based on the date of signing the construction contract) of 2529480.32 yuan. 3. Qualification requirements for bidders: 1. Bidders must have the right to independently enter into contracts, the ability to perform contracts, including professional and technical qualifications and abilities, financial, equipment, and other material facilities conditions, management ability, experience, reputation, and corresponding employees; 2. Bidders must meet both construction qualification requirements and design qualification requirements simultaneously; Construction qualification requirements: Possess a Class B or above qualification for general contracting of power engineering construction or a Class B or above qualification for general contracting of mechanical and electrical engineering construction issued by the competent construction administrative department, and also possess national qualifications
View hidden content