浙江The Taihu Lake Lake Lougang Protection, Restoration, Treatment and Activation Project, a World Irrigation Project Heritage - Embankment Bid Raising Project Supervision Project for the Great Embankment around the Lake (Changdou Port Extension~Changdongtan Section) [A3305300710000227003001]

CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view

To view hidden content (*), please log in first

< spanid="litPosition"> Information Disclosure Bidding Announcement/ span> Project name: the Taihu Lake Lougang Conservation, Restoration, Treatment and Activation Project, a World Irrigation Project Heritage, Project code: 2020-330591-76-01-123556 Tenderee: Name: Urban Construction and Development Center of South the Taihu Lake New Area, Huzhou Address: Contact person: Urban Construction and Development Center of South the Taihu Lake New Area, Huzhou Tel.: 13511230969 Agency: Name: Zhejiang Tianfang Engineering Management Consulting Co., Ltd. Address: Contact person: Sheng Yunping Tel.: Project overview: see the bidding conditions of Huzhou Public Resources Information Network: the bidding content and scope have been met: bid raising of the levee around the lake (Changdou Port extension section~Changdongtan section), including the new 130130 flood prevention channel of the levee around the lake 4m (the flood control channel at Changdongtan section is 652.15m, the extension section of Changdou Port is 601.98m, and the connecting road at the south side of Changdou Port is 50m), and the reinforcement structure of the slope protection of the great levee around the lake is designed to cover a total area of 39220m2 at Changdongtan section and the extension section of Changdou Port; Other water conservancy facilities include the relocation and construction of one Huzhou Military Civilian Governance Monument (with a height of 21m and a base thickness of 0.6m), and the construction of one new flood control emergency ship parking and landing point (with an area of 25m * 10m). The flood control design standard for embankments is once every 100 years, and the embankment level is level 1. The bidding for the supervision of the entire construction process of the construction project, including but not limited to the supervision and related services of the entire construction and installation content of the embankment upgrading project of the lake surrounding embankment (Changdou Port extension to Changdongtan section). Bidding scale: The project mainly includes the flood control and drainage project (Phase I) in the pilot area of South the Taihu Lake New Area (the end area of East West Tiaoxi), the flood control and drainage project in the pilot area of South the Taihu Lake New Area, the ecological restoration and management project in Changdong Siyang, the ecological restoration and management project in the south section of the east bank of Changdou Port, the follow-up project of the Great Embankment around the Lake (Zhejiang section) (the landscape project in the new section of South the Taihu Lake Lake), and the ecological renovation project in Changdong beach. The specific construction contents include levee upgrading, entrance buildings, water system renovation, landscape green space, garden roads, pavement, wooden plank roads, landscape bridges, revetment wharves, garden ornaments, parking lots, lighting, and supporting buildings (wetlands Science Museum, Wetland Science Museum, Urban Bookstore, Service Center, etc.). The total land area occupied by the project is 417.3968 hectares (approximately 6261 acres). The flood control and waterlogging drainage project (Phase I) in the pilot area of South the Taihu Lake New Area (the end area of East and West Tiaoxi) has a length of 6.3 kilometers, a total length of 13.3 kilometers of new bank protection, and 23.8 hectares of waterfront landscape green area on both banks; The flood control and waterlogging drainage project in the start-up area of South the Taihu Lake New Area mainly renovates and newly excavated 41 rivers, with a length of 34.43 kilometers, 66.2 kilometers of bank protection, 1367 mu of lake surface area renovated, 66.2 kilometers of bank protection newly built, 18 sluices and pump stations newly built and reconstructed, and one 50000 ton/day raw water pretreatment plant newly built; The Changdong Siyang Ecological Restoration and Management Project has a newly built green area of 731097 square meters, 138810 square meters of aquatic plants, 175726 square meters of road paving, 19136 meters of revetment renovation, and supporting building area
View hidden content