山西CGN New Energy Shanxi Shilou 100MW Onshore Wind Power Project Phase IV Tower (Equipment) Procurement Project
CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view
To view hidden content (*), please log in first
 &# xa0;&# xa0; Chapter 1&# xa0; Tender Notice&# xa0&# xa0;&# xa0;&# xa0;&# xa0; Location of the bidding project: Shilou County, Lvliang City, Shanxi Province. 1. Bidding conditions: The fourth phase tower (equipment) procurement project of CGN New Energy Shanxi Shilou 100MW onshore wind power project (bidding project number: CGN-202504020005) has been approved; Approval&# xa0;, The project funding source is self raised by the enterprise and has been confirmed. The bidder is China General Nuclear Power Shilou Wind Power Generation Co., Ltd. This project has met the bidding conditions and is now open for bidding. 2、 Project Overview and Bidding Scope Project Industry: Energy and Power Project Scale: CGN Shilou Longjiao Phase IV Wind Farm Phase I Project is located in Shilou County, Lvliang City, Shanxi Province, 16km away from the urban area of Shilou County. The ground elevation of the project is between 1200m and 1500m, and the total area of the site is about 41.78km2. The overall terrain of the site is undulating and belongs to the loess plateau landform. The wind turbines are mainly arranged along the mountain ridges. Design and install 16 wind turbines with a single capacity of 6.25kW. Bidding content and scope: 16 wind turbine supporting tower tubes, as well as their anti-corrosion coating, transportation, and related services including the "China General Nuclear Power" logo and other related markings. The scope of supply includes the tower body and its internal mechanical and electrical accessories (specifically metal structural components such as tower platform, internal ladder, external ladder, cable support, lightning protection grounding wire, cable fixing clamp block, fire extinguishing equipment inside the tower, etc.); Tower lighting system (including lamps, cables, etc.), electrical junction box; Wire rope type anti fall protection device (excluding rope gripper); Temporary steel wire rope for hoisting; Procurement, acceptance, and re inspection of raw materials and internal components required for tower fabrication. Packaging, transportation, insurance, delivery, provision of technical documents, technical services, on-site acceptance, etc. for finished tower products. The specific scope and requirements of the bidding shall be subject to the provisions of the bidding documents. Planned delivery date: The seller shall deliver 4 tower tubes before May 15, 2025, and the remaining 12 tower tubes before June 1, 2025. The specific delivery date shall be subject to the written notice from the project department of the bidding party. The specific delivery plan and requirements shall be subject to the provisions of the bidding technical documents. 3、 Qualification Requirements for Bidders: 1. Basic Qualifications: Bidders should be independent legal entities registered within the territory of the People's Republic of China in accordance with the Company Law of the People's Republic of China, with independent legal personality and the ability to provide products and services for this project. 2. Qualification requirements: Bidders must possess the following production capabilities: producing at least 15 sets of tower tubes for wind turbines per month (Bidders must provide monthly production specifications, manufacturing equipment lists, technical personnel lists, factory size and material storage space specifications in the bidding documents. The tenderer has the right to conduct on-site inspections and use the inspection results as the basis for bidding). 3. Financial requirement: The bidder is not in a state of being ordered to cease operations, having their assets taken over, frozen, or bankrupt. Having financial audit reports for the past three years (2021-2023). 4. Performance requirements: Bidders must meet the following performance requirements