上海Tender Notice for Survey and Design of Emergency Support Ramp Section Project on Nanwei Fifth Road, Pudong Airport

CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view

To view hidden content (*), please log in first

Tender Notice for Survey and Design of Emergency Support Ramp Section Project on Nanwei Fifth Road of Pudong Airport&# xa0;&# xa0;&# xa0;&# xa0; The bidding conditions for the emergency support ramp section project of Nanwei Fifth Road at Pudong Airport have been approved by&# xa0; Shanghai Airport (Group) Co., Ltd; (Name of project approval, verification or filing authority) Approved for construction under the "Reply on the Emergency Support Ramp Section Project of Pudong Airport South Wei Wu Road" Shanghai Airport Ji Gui (2025) No. 71 (Approval Name and Number). The bidder is Shanghai Airport (Group) Co., Ltd. The construction funds are self raised by the enterprise (source of funds), and the project contribution ratio is 100% state-owned. We are now conducting a public tender&# xa0;&# xa0;&# xa0;&# xa0;&# xa0; Project Overview and Bidding Scope 2.1 Project Overview Pudong Airport South Wei Wu Road Emergency Support Ramp Project The main construction content of the ramp project is the airport's internal dedicated ramp. The construction scope starts from South Wei Wu Road, turns from west to north, crosses South Jing 16 Road, and merges into the proposed S32 access elevated road on the left side. The total length is 177.087 meters, with one lane in one direction and a width of 8 meters. The construction content mainly includes road engineering, bridge engineering and its ancillary facilities such as lighting, monitoring, signs and markings. 2.2 Construction Site: Starting from Nanwei 5th Road, turning from west to north, crossing Nanjing 16th Road, and merging into the proposed S32 access elevated road on the left side. 2.3 Construction period: 356 calendar days 2.4 Design and survey period: 50 calendar days. Among them: (1) The design period is 50 calendar days, which means that the construction drawing design will be submitted 50 days after the contract is signed; (2) The survey period is 30 calendar days, which means that the survey report will be submitted 30 days after the contract is signed. Note: The design cycle and survey cycle can overlap. Section 2.5 Division: Not divided. Section 2.6 Bidding Scope: Includes all design and survey work within the scope of this project. (1) Survey work content and standards: The survey services provided by Party B include geotechnical engineering survey (engineering survey, underground pipeline and obstacle exploration, etc.) and other survey work required to meet the design work of this project. The survey report meets the corresponding depth requirements for the survey stage stipulated by the national and Shanghai municipal regulations, providing the necessary information for project design and construction. (2) Design work content and standards: Design general contracting, after winning the bid, undertake the optimization of the project design scheme (including estimation preparation), preliminary design (including budget preparation) and approval modification, construction drawing design (including preparation of technical specifications) and on-site design services (including but not limited to on-site services, design disclosure, solving design technical problems during construction, design changes and technical and economic impact analysis on the construction site, participating in intermediate acceptance, completion acceptance, industry acceptance, responsible for organizing technical rectification according to acceptance requirements, budget tracking analysis and calculation, etc.), follow-up services (including integration and compilation of final construction drawings, creating conditions for completion drawing preparation and doing a good job in coordination work, design work reports and coordination work related to completion acceptance, project settlement and final accounts, etc.) audit cooperation, etc.), Design data archiving (providing archiving basic data to Party A or the archive preparation department);
View hidden content