浙江The second phase of the mall has launched a block project (intelligent equipment and installation)

CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view

To view hidden content (*), please log in first

Notice of Winning Bid for Engineering Construction Project Zhejiang Chengyue Technology Co., Ltd.: After evaluation by the Bid Evaluation Committee and public announcement of the winning bidder candidates, it is now determined that your company has won the bid. Please sign the construction project contract with our company within 30 days of receiving this notice. This is to inform you. The second phase of the bidding project mall has launched the block project (intelligent equipment and installation) with registration number Taijian Zhaobei [2025] 3018. The bidding method is open to the public. The bidding party is Zhejiang Road and Bridge China Daily Necessities Mall (Group) Co., Ltd., and the bidding agency is Jianjing Investment Consulting Co., Ltd. The bidding content this time is for the construction bidding of building intelligent professional engineering, which is included in the general contracting management. The intelligent equipment and installation works (excluding pipelines, cables, embedded parts, and cable trays) included in the construction drawings and budget provided by the tenderer. The total land area of this project is 22300 square meters (including 19947 square meters of planned construction land), with a total construction area of 57800 square meters (including 40600 square meters of above ground construction area and 17200 square meters of underground construction area), 5 floors above ground and 1 floor underground, a building height of 23.95 meters, and a maximum single span of 27 meters. The winning bidder, Yang Huili, the project leader of Zhejiang Chengyue Technology Co., Ltd., with certificate number Zhe 2332007202306163, won the bid with a price of 2583696 yuan and a qualified quality standard for a construction period of 150 calendar days. She must cooperate with the general contracting and decoration construction progress to complete the project on schedule and hand over the entire project. Remarks: Yang Huili (330682 * ********** 24) Tender Agent (seal): Tenderee (seal): Regulatory Department (seal): Tender Agent Manager: Ren Yusheng. Please download the attachment on April 15, 2025 from the website: https://ggzy.tzztb.zjtz.gov.cn/jyxx/002001/002001006/20250415/ab8afb85-a1b1-4f69-8340-c1fdf0f62da1.html
View hidden content