贵州Overall leasing project for idle assets on floors 8-13 of Building N2, Financial City

CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view

To view hidden content (*), please log in first

Financial City N2 Building 1 Floor 8-13 Idle Asset Overall Lease Project 2025-04-15 Super Project Name: Financial City N2 Building 1 Floor 8-13 Idle Asset Overall Lease Project Project Number: GP-C-ZL-2025216 (216) State owned Assets Monitoring Number: -- Listing Price: 378681.6 yuan/year Information Disclosure Date: 2022-04-15 to 2022-04-21 Registration Subject Name: Financial City N2 Building 1 Floor 8-13 Idle Asset Overall Lease Project Number: GP-C-ZL-2025216 (216) Information Disclosure Period: April 15, 2025 to April 21, 2025 (5 working days) List of Leased Assets Number Asset Name Property Rights Lease Area (㎡) Asset Status Lease Base Price (yuan/year) Lease Term Not Exceeding (year) Lease Deposit (yuan) Transaction Deposit (yuan) Is there a note from the original tenant stating that the subject matter 1 is located at No. 8-13, 1st Floor, Building 2, N Cluster, Guanshanhu District International Financial Center, Guiyang City? There is no 358.6 idle 378681.65315568075000. No, is there any mortgage or guarantee for the subject matter? Asset type of the subject matter: □ Residential building ■ Commercial building □ Idle land use right □ Other supporting facilities of the subject matter. Water □ Yes □ No □ No electricity □ Yes □ No □ Gas □ Yes □ No □ No telephone □ Yes □ No □ Fiber optic □ Yes □ No □ Cable TV □ Yes □ No □ Other situations where the subject matter cannot be fulfilled due to force majeure factors such as urban renovation? The lessor shall not assume any responsibility or economic compensation. 2. For other terms, please refer to the "House Lease Agreement". 3. In principle, the lessee shall operate and use the property themselves. If partial subleasing of the property is required, the consent of the owner must be obtained. The lessee shall not transfer the property for third-party operation and use. The lessee shall carry out internal decoration and water and electricity installation according to the determined business content, and shall not change or damage the appearance of the property. Do not use the house to engage in illegal business or activities involving pornography, gambling, drugs, pyramid schemes, etc., and do not store flammable, explosive, or other dangerous goods in the house. During the lease term, the lessee shall use and take good care of the property and its ancillary facilities in a reasonable manner. If the leased property and its ancillary facilities are damaged or malfunction due to improper management, use or unreasonable use by the lessee, the lessee shall be responsible for repairing and replacing them. 5. If the lessee needs to renovate or add ancillary facilities and equipment, they shall obtain the written consent of the lessor in advance and provide the decoration design drawings and construction drawings to the lessor. If approval is required from relevant departments, the lessee shall be responsible for handling it in accordance with the law. 6. Upon termination of the contract period, the lessee shall return the property to its original condition and return it to the lessor on time; When the house is not returned on time, rent will be charged based on the actual number of days occupied. 7. When returning the house, the lessee shall voluntarily dismantle and remove the decoration and installation carried out during the lease period without damaging the building structure. If it cannot be dismantled or will damage the house after dismantling, the lessee shall not dismantle it. The lessor will not provide any compensation for this part of the decoration. 8. The target of this lease is Guanshanhu District International Gold in Guiyang City
View hidden content