安徽2025 Forestry Pest and Disease Control and Management Project in Hefei Economic Development Zone
CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view
To view hidden content (*), please log in first
1、 Original Announcement Main Information Original Project Name: Hefei Economic Development Zone 2025 Forestry Pest and Disease Control Project Original Project Number: 2025AJJFN00025 Original Announcement Date: April 8, 2025 II. Announcement Content (Correction Items, Content, Date, etc.) Hefei Economic Development Zone 2025 Forestry Pest and Disease Control Project Correction Announcement I. Project Basic Information Project Number: 2025AJJFN00025 Project Name: Hefei Economic Development Zone 2025 Forestry Pest and Disease Control Project First Announcement Date: April 8, 2025 II. Correction Information Correction Item: □ Procurement Announcement? Correction to Procurement Document □ Procurement Results: 1. The "Chapter 3 Procurement Requirements - (V) Personnel Requirements" of this project should be corrected to: The successful supplier must provide a service team of no less than 10 people for this project (including 1 project leader and 1 technical leader), and emergency rescue personnel should be equipped in the team to meet the safety and security needs of the project implementation process. During the service process, it is necessary to ensure the stability of personnel, and adjustments are not allowed without the approval of the purchaser. At the same time, all service personnel must obey the management and work arrangements of the purchaser. If they do not meet the requirements, the purchaser has the right to request the supplier to be replaced. Otherwise, the purchaser has the right to pursue breach of contract liability. Note: Except for the personnel certification materials required in the scoring items as scoring criteria, there is no need to provide other certification materials for the above-mentioned personnel in the response document; After the contract is signed, personnel certification materials that meet the above requirements must be provided for the purchaser to verify before the implementation of project services. If the supplier's response in the response document is better, the personnel certification materials in the response document shall be provided for the purchaser to verify; If the verification fails, the rectification must be completed within the time specified by the purchaser, otherwise the purchaser has the right to pursue liability for breach of contract. 2. The "Chapter 3 Procurement Requirements - (VI) Assembly Equipment Requirements" of this project is corrected to: In order to ensure the smooth progress of this project, the contracted supplier shall provide at least 10 thermal smoke machines and 10 vehicles with a confirmed carrying capacity of no less than 6 people for this project. The contracted supplier shall strictly equip the necessary facilities and equipment according to the requirements, and submit the equipment list and relevant supporting materials to the purchaser for filing before the project implementation after the contract is signed. Otherwise, the purchaser has the right to pursue breach of contract liability. Except for the assembly and equipment certification materials required in the scoring items as scoring criteria, there is no need to provide other certification materials for the assembly and equipment mentioned above in the response document. 3. In Chapter 4 of the procurement documents for this project, "Personnel Management Plan" has been added to the evaluation methods and standards. The evaluation criteria are as follows: the personnel management plan supplier shall develop a targeted personnel management plan based on the procurement requirements of this project, which shall be comprehensively evaluated by the negotiation team: 1. If the plan is complete and detailed, superior to the procurement requirements of this project, and has strong feasibility and practicality, 4 points will be awarded; 2. If the plan is complete and detailed, suitable for the procurement needs of this project, feasible and practical, 2 points will be awarded; 3. If the plan is basically suitable for the procurement needs of this project, and the feasibility and practicality need to be improved, 1 point will be awarded; If the plan is not feasible or relevant content is not provided, this item will not be scored. 0-4 points 4. In Chapter 4 of the procurement documents for this project, the evaluation methods and standards are included