山东GTFL20250409001 Procurement Announcement for Titanium Iron Procurement Project of Linyi Iron and Steel Investment Group Special Steel Co., Ltd

CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view

To view hidden content (*), please log in first

1、 The purchaser of the titanium iron procurement project is Linyi Iron and Steel Investment Group Special Steel Co., Ltd., and the project funds are self raised by the enterprise. The project has met the procurement conditions, and now we are conducting online reverse bidding procurement for the above-mentioned project. 2、 Project Overview: 1. Procuring Party: Linyi Iron and Steel Investment Group Special Steel Co., Ltd. 2. Project Name: Titanium Iron Procurement Project of Linyi Iron and Steel Investment Group Special Steel Co., Ltd. 3. Project Number: GTFL202504090014. Project Overview: To meet the production needs of Linyi Iron and Steel Investment Group Special Steel Co., Ltd., titanium iron is being procured. 5. Maximum control price: 16040 yuan/ton. The price reduction is 40 yuan. 6. Quality requirements and technical standards: (1)、Ti≥30%; C≤0.2%; Si≤5%; P≤0.07%; S≤0.04%; Al≤8.5%; Particle size: 10-50mm ≥ 90%; Each ton bag packaging bag weighs 3kg and is free from moisture; Packaging bag labeling requirements include factory name, product name, model, main element content, size, weight, production date (or batch number). (2) Concession acceptance method: Ti: For every 0.1% decrease compared to 30%, the price will decrease by 5 ‰; C: For every 0.01% increase compared to 0.2%, the price decreases by 2 ‰; Si: For every 0.1% increase compared to 5%, the price decreases by 2 ‰; P: For every 0.01% increase compared to 0.07%, the price decreases by 5 ‰; S: For every 0.01% increase compared to 0.04%, the price decreases by 5 ‰; Al: For every 0.1% increase compared to 8.5, the price decreases by 5 ‰; Granularity; 10-50mm < 90%, double deduction for excess tonnage on a per vehicle basis; Packaging bags will be fined 10 times for any excess. (3) Other requirements: 3.1 After particle size screening, if any proportion of the particle size exceeds the upper and lower limits by more than 20%, it will be judged as cheating and an additional 3% of the payment for this batch will be assessed. 3.2. The packaging bag label and the single package code for each bicycle must be unique, clear, and identifiable. If the product label is missing 3 or less items, a deduction of 50 yuan/ton will be made for this batch. If more than 3 items are missing, the product will be rejected and punished according to the standard for return and exchange. 3.3. If the materials for return or exchange meet the rejection criteria and do not cause any loss to production or do not meet the on-site usage requirements, a penalty of 3% of the payment (contract price) for this batch of goods shall be deducted. If the materials are not suitable for on-site use due to the buyer's reasons for return or exchange, a written application must be issued by the steel plant and will not be assessed. (4) Reject condition: Reject when one or more of the following conditions are met:; Ti<28%; C>0.5%; Si>7%; P>0.1%; 7. Payment method: Cash on delivery. After the goods arrive, the settlement amount shall be determined based on the inspection report of Party A. The supplier shall issue a full value-added tax special invoice (tax rate of 13%) and settle the payment. 8. Supply period: 20 calendar days after signing the contract. 9. Delivery location: Material yard of Linyi Iron and Steel Investment Group Special Steel Co., Ltd. 10. The quotation includes all costs and taxes up to the delivery location. 11. The quotation is valid for 7 days. 12. Requirements for transport vehicles: New energy transport vehicles entering the site. 13. Listed in the recruitment due to issues such as bid rigging and collusion
View hidden content