浙江Procurement Announcement for Power Supply and Maintenance of Xingye Corridor Railing Machine Lines for Centralized Transport Board Houses (G25009)

CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view

To view hidden content (*), please log in first

Inquiry Announcement 1. Purchase Order Number: P-XJ-25-005120 2. Purchase Order Name: Power Supply for Container House and Maintenance of Industrial Corridor Railing Machine Line (G25009) 3. Quotation Deadline: April 18, 2025 4:00 4. Quotation Validity Period: July 17, 2025 5. Maximum Price Limit: 20000 yuan 6. Organizational Form: Self Procurement 7. Procurement Execution Unit: Ningbo Daxie Container Terminal Co., Ltd. 8. Procurement Execution Person: Hu Dongjie 9. Procurement Execution Person Contact Information: 0574-86719721 10. Inquiry Type: Public 11. Bid Evaluation Address: Engineering Technology Department of Ningbo Daxie Container Terminal. Specific specifications, technical indicators, and after-sales service requirements are detailed in the table or attachment below. The sentence is:. Number: Procurement Project Name: Procurement Quantity: Unit of Measurement: Tax Rate: Project Duration Requirements: Location: Specification and Model: Note 1: Maintenance of Supporting Power and Industrial Road Barrier Machine Lines for Centralized Transportation Board Houses: 30 days. Ningbo Daxie Jisi Port: 1. Specific requirements are detailed in the attachment. 2. The quotation must indicate the actual tax rate on the stamped quotation and electronic quotation. 3. The quotation defaults to meeting the construction period. 10. Quotation Requirements: Please fill in the unit price including tax according to the detailed list. 11. Payment Method: Payment after delivery and acceptance. 12. Other Content: 1. The quoted price must be in RMB including tax (a fixed price, please indicate the value-added tax rate), and the specific quotation must include all expenses that the winning bidder should bear. 2. This project requires construction personnel with Level 2 qualification for general contracting of power engineering construction, valid safety production license, ISO9001 quality management system certification, ISO14001 environmental management system certification, at least 2 construction personnel, and a low-voltage electrician operation certificate. 3. If the delivery of labor and materials for this project is delayed or the acceptance is not qualified, the order will be returned, exchanged or cancelled without reason, and all economic losses caused by this will be borne by Party B. 4. Our payment method: 100% of the project payment shall be made within 60 days after the completion and acceptance of the project (subject to the signing of the project acceptance report by both parties) and receipt of the full value-added tax special invoice from Party B. 5. If your company has any special instructions, please indicate them in the quotation document. 6. The winning bidder shall be determined based on the lowest price. If there are multiple quotations and the project period is the same, the lowest quotation shall be awarded based on the pre tax price, the order of quotation response, etc. 7. This order is for inquiry only and is not a definite purchase. Please be cautious when quoting. The winning bid announcement will be confirmed through website publication, and those who have not won the bid will not be notified separately. 8. Please cooperate with our company to complete the registration of entry information and other related work. 9. The quotation must comply with the above terms. If the quotation does not comply with the above terms and there is no special written explanation, our company will consider it an invalid quotation, and if the winning candidate is not awarded, it will not be awarded. Release date: April 15, 2025
View hidden content