北京Tender Announcement for the Second Batch of Port Equipment (Shiploader) Centralized Procurement Public Bidding Project of National Energy Group in 2024

CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view

To view hidden content (*), please log in first

Chapter 1 Public Bidding 1. Bidding Conditions The name of this bidding project is the National Energy Group's 2024 Second Batch of Port Equipment (Shiploader) Centralized Procurement Public Bidding, and the project bidding number is: CEZB250203249, The bidder is Guoneng Road Port (Beijing) Materials Co., Ltd., and the project unit is Guoneng Huanghua Port Co., Ltd. The funding source is self raised. The bidding agency is National Energy Group International Engineering Consulting Co., Ltd. This project has met the bidding conditions and is now undergoing domestic qualification review and open bidding. 2. Project Overview and Bidding Scope 2.1 Project Overview, Bidding Scope, and Section (Package) Division: This project is divided into one package, and bidders must bid according to the package and are not allowed to select some goods from each package for bidding. The bidding scope includes the supply, transportation, and related services of the ship loader. (For specific package division, delivery time, delivery location, material name and specifications, quantity, etc., please refer to the "List of Bidding Goods"). List of Tender Goods, Package Number, Package Number, Material Name, Specification, Model, Unit Quantity, Unit Delivery Time, Delivery Location: 11SL13 Ship Loading Machine, Mobile Rotary, Rated Capacity 8000t/h, Maximum Capacity 9200t/h, Track Gauge 23m, Maximum Outward Extension 29.3m, Unit 1. The total supply period of Guoneng Huanghua Port Co., Ltd. is 16 months, and the installation and single machine joint debugging of the civil foundation will be completed within 3 months after the installation conditions are met. The 2SL14 Ship Loading Machine, Mobile Rotary, Rated Capacity 8000t/h, Maximum Capacity 9200t/h, Track Gauge 23m, Maximum Outward Extension 37.0m, Unit 1. The total supply period of Guoneng Huanghua Port Co., Ltd. is 3 months. The construction period is 18 months, After the civil foundation meets the installation conditions, the installation and single machine joint debugging of the 3SL15 ship loader mobile rotary type with a rated capacity of 8000t/h, a maximum capacity of 9200t/h, a track gauge of 23m, and a maximum outward extension distance of 37.75m will be completed within 3 months at the dock site of Huanghua Port Phase V Project in Bohai New Area, Cangzhou City, Hebei Province. The total supply period of Guoneng Huanghua Port Co., Ltd. is 18 months, and the civil foundation will be installed and single machine joint debugging will be completed within 3 months at the dock site of Huanghua Port Phase V Project in Bohai New Area, Cangzhou City, Hebei Province. 2.2 Other:/3. Qualification requirements for bidders 3.1 Qualification conditions and performance requirements: [1] Qualification requirements: Bidders must be independent legal persons or other organizations registered in accordance with the law. Effective proof documents must be provided. 【2】 Financial requirements: [3] Performance requirements: Bidders must have at least 2 contracted ship loaders with a rated capacity of ≥ 6000t/h, and have been successfully put into use for 1 year or more. Bidders must provide scanned copies of contracts and corresponding user certificates that can prove the performance requirements of this bidding process, as well as at least one scanned copy of the invoice for each contract. The scanned copy of the contract must include at least the stamped pages of both the buyer and seller of the contract, the date of contract signing, the name and model of the materials, and other key information pages in the performance requirements (if the contract does not reflect whether it is a ship loader with a rated capacity of ≥ 6000t/h, the corresponding capacity of the contract must also be provided)
View hidden content