云南D53MX0825001011C1 Yunnan Baoshan Electric Power Co., Ltd. Shidian Branch 2024 Production Investment Plan Project 35kV Huaxing Transformer, Laomai Transformer and Equipment Self investment Project (Secondary)
CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view
To view hidden content (*), please log in first
Competitive Negotiation Announcement for the 2024 Production Investment Plan Project of Yunnan Baoshan Electric Power Co., Ltd. Shidian Branch: 35kV Huaxing Transformer, Laomai Transformer and Equipment Self Investment Project (Secondary). Project Overview: Potential suppliers for the 2024 Production Investment Plan Project of Yunnan Baoshan Electric Power Co., Ltd. Shidian Branch: 35kV Huaxing Transformer, Laomai Transformer and Equipment Self Investment Project (Secondary) should be listed on the Yuncai Zhaoyang Electronic Procurement Trading Platform (website: https://www.ebidcn.com )Obtain the competitive negotiation document and submit it before 15:00 on May 9, 2025 (Beijing time). 1、 Basic Project Information Project Number: D53MX0825001011C1。 Project Name: Yunnan Baoshan Electric Power Co., Ltd. Shidian Branch 2024 Production Investment Plan Project 35kV Huaxing Transformer, Laomai Transformer and Equipment Self investment Project (Second). Procurement method: Competitive negotiation. Budget amount: 260000 yuan. Maximum price limit (including tax): 260000 yuan. Procurement requirement: One new segmented protection measurement and control device, as well as a backup automatic switching device, will be added to the 35 kV Huaxing substation. The device will have segmented backup automatic switching function, incoming line backup automatic switching function, phase current overcurrent protection with two segments locked by compound voltage, three-stage overload switching function, and the ability to switch small power supply lines to the grid through device action. The device is installed in the original 35kV line protection measurement and control screen II. The 35kV old wheat substation will replace the segmented protection measurement and control and backup automatic switching device in this phase. The device has the functions of segmented backup automatic switching and incoming line backup automatic switching, two-stage phase current overcurrent protection through multiple voltage blocking, three-stage overload coupling switching function, and device action can be coupled to cut off small power grid lines. The device is installed on the original 35kV and 10kV busbar segmented backup automatic switching and protection measurement and control screen. For specific content and technical requirements, please refer to Chapter 5 "Procurement Requirements and Technical Requirements". Construction location: Designated location by the purchaser of the 35 kV Huaxing and Laomai substations in Shidian County, Baoshan City. Construction period requirement: The supply, installation, commissioning, and operation of equipment and materials shall be completed within 30 calendar days after the contract is signed. The specific start time shall be subject to the notification of the purchaser. Quality requirements: comply with current national, industry, and local standards and specifications, ensure that the installed backup automatic switching device is compatible with the original backend, and meet the functional requirements of the technical specifications for one-time acceptance. Engineering safety control requirements: To prevent personal death accidents, serious injury accidents, major equipment and quality accidents, and ensure that the project has no permanent defects. Warranty period: 5 years from the date of acceptance and operation of the equipment and materials. In the event of product damage thereafter, the supplier shall promptly provide repair parts for this set of equipment and provide them according to the bidding price of this project. Contracting method: general contracting for labor, materials, and construction. This project does not accept consortia. 2、 Supplier qualification requirements: 1. Meet the provisions of Article 22 of the Government Procurement Law of the People's Republic of China. 2. Qualification requirements for implementing government procurement policies: None. 3. Specific qualification requirements for this project: (1) The supplier must have a third level or above qualification for general contracting of power engineering construction or a third level or above qualification for professional contracting of power transmission and transformation engineering, and also have a license to undertake the installation (repair, testing) of power facilities