陕西Announcement on Pre Qualification of EPC General Contracting for Phase III and Batch II of Shiyuan Runfu Project

CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view

To view hidden content (*), please log in first

1. Bidding conditions: The second batch of EPC general contracting for the third phase of the Shiyuan Runfu project has been approved for construction by the Development and Reform Bureau of Xi'an Chanba Ecological Zone at 2305-610158-04-01-611756. The project owner is Xi'an Shiyuan Runying Real Estate Co., Ltd. The project funds come from a state-owned holding project, and the project contribution ratio is 100.00% self raised funds. The bidder is Xi'an Shiyuan Runying Real Estate Co., Ltd., and the bidding agency is Huaruicheng Project Management Co., Ltd. The project has met the bidding conditions and is now open for bidding. 2. Project Overview 2.1 Project Scale: The second batch of Phase III of the Shiyuan Runfu project is located in the Chanba Ecological Zone of Xi'an City, adjacent to Expo Avenue to the north and Wenyuan Road to the east. It is planned to build 6 residential buildings, 1 kindergarten, and 2 commercial supporting buildings, with a total construction area of approximately 87376.10 square meters, including 69040.59 square meters of above ground construction area and 18335.51 square meters of underground construction area; Shear walls, frame shear walls, and frame structures, with a maximum single building area of approximately 13340.17 square meters; The maximum single span is about 10 meters, the maximum building height is about 75.45 meters, and the maximum number of floors is about 23. The engineering budget is approximately 230.4982 million yuan, including construction and installation costs of approximately 218.4403 million yuan and design costs of approximately 12.0579 million yuan; 2.2 Project Location: Located in Chanba Ecological Zone, Xi'an City, adjacent to Expo Avenue to the north and Wenyuan Road to the east; 2.3 Total project investment: 5800000000 yuan; 2.4 Section Division: Section Name: EPC General Contracting for Phase III and Batch II of Shiyuan Runfu Project; Section number: E6101113506rFLlP2Mb4001; Section type: Engineering general contracting; 2.5 Bidding Scope: Section Name: EPC General Contracting for Phase III and Batch II of Shiyuan Runfu Project. The Phase III and Batch II of Shiyuan Runfu Project is located in Chanba Ecological Zone, Xi'an City, adjacent to Shibo Avenue to the north and Wenyuan Road to the east. It is planned to construct 6 residential buildings, 1 kindergarten, and 2 commercial supporting buildings, with a total construction area of approximately 87376.10 square meters, including 69040.59 square meters of above ground construction area and 18335.51 square meters of underground construction area; Shear walls, frame shear walls, and frame structures, with a maximum single building area of approximately 13340.17 square meters; The maximum single span is about 10 meters, the maximum building height is about 75.45 meters, and the maximum number of floors is about 23. The engineering budget is approximately 230.4982 million yuan, including construction and installation costs of approximately 218.4403 million yuan and design costs of approximately 12.0579 million yuan; 2.6 Other:. 3. Qualification Requirements for Applicants 3.1 Section Name: Second Batch EPC General Contracting of Phase III of Shiyuan Runfu Project. This qualification pre-approval requires applicants to have the qualifications of "Construction Engineering General Contracting Level 2" or above and "Construction Industry (Construction Engineering) Level A" or above, or "Construction Engineering General Contracting Level 2" or above and "Construction Industry Engineering Design Level A" or above, or "Construction Engineering Construction General Contracting Level 2" or above and "Engineering Design Comprehensive Qualification Level A" or above, and to have corresponding abilities in personnel, equipment, funds, etc. Among them, the bidder intends to appoint a project manager with a registered architect level one or above, or a registered construction engineer
View hidden content