西藏Bid Announcement for Business Operation Project of Maintenance and Renovation of Nagqu Branch and Nierong County Branch
CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view
To view hidden content (*), please log in first
Tender Notice for the Business Operation Project of the Nairong County Branch of the Nagqu Branch of Agricultural Bank of China Limited. The tender notice is for the procurement of the business operation project of the Nairong County Branch of the Nagqu Branch of Agricultural Bank of China Limited. 1、 Project Name and Tender Number: Nagqu Branch Maintenance and Renovation Nierong County Branch Business Operation Project (Tender Number: HDZB-250403) II. Project Introduction Procurement Content: Nagqu Branch Maintenance and Renovation Nierong County Branch Business Operation Project. Number of winning bidders: 1. Funding source: self raised by the enterprise. Section division:/. Basic information: The project has been reviewed by the Financial Review Committee of Nagqu Branch at its third meeting in 2025 and by the Party Committee of Nagqu Branch at its ninth session in 2025, and has been included in the planning scope of the district branch's infrastructure project from 2025 to 2027. At the same time, the "Approval for the Maintenance and Renovation of Nagqu Branch Nierong County Branch Business Operation Project" [Nongyin Nafu 2025] No. 3 document has been issued with an approved amount of 2662037.48 yuan (including tax), and the project has been approved for approval. Simultaneously entrust Zhongyi Engineering Management Co., Ltd. to prepare the bidding control price. The bidding control price for project construction and installation fees is 2355854.72 yuan (including tax) and 2161334.6 yuan (excluding tax), with a value-added tax rate of 9%. (Please refer to the bill of quantities and design construction drawings for details). Construction period: The total construction period is 3 months. The commencement date shall be subject to the notice of the employer, the total construction period shall be calculated from the date of signing the contract, and the completion date shall be subject to the acceptance of the contractor after completing all the engineering contents of the contract. 3、 Supplier qualification requirements: 1. The supplier has a third level or above qualification for general contracting of construction engineering or a second level or above qualification for professional contracting of building decoration engineering. 2. Must be legally registered domestically, able to independently bear civil liability, and have a business license (three in one) issued by the administrative department. 3. As of the bidding deadline, bidders have not been listed on the "Credit China" website( http://www.creditchina.gov.cn )Include in the list of dishonest persons subject to enforcement, major tax illegal dishonest entities, and government procurement serious illegal dishonest behavior records. 4. The bidder or their products/services have not been included in the Agricultural Bank of China's centralized procurement ban list. 5. The legal representative, unit head, or authorized representative of the bidder has not been included in the "List of Prohibited Personnel for Centralized Procurement of Agricultural Bank of China". 6. The legal representative, controlling shareholder or actual controller of the bidder and the senior executives of the tenderer, as well as key personnel in the demand department and procurement department, have no marital, direct blood relatives, collateral blood relatives within three generations, or close relatives by marriage. 7. Bidders with the following affiliated relationships are prohibited from participating in this project bidding simultaneously: (1) having a controlling or management relationship; (2) One party directly holds the equity of the other party, with a proportion exceeding 20%; (3) Simultaneously held by third-party legal entities or non legal entities or natural persons, with a proportion exceeding 20% (excluding bidders controlled by the state); (4) One of the main personnel such as the unit leader, director, and supervisor is the same person (listed as the "Main Personnel Information" on the "National Enterprise Credit Information Publicity System")