广东Guangdong Province Reserve Grain Shantou Direct Warehouse Phase II Project - Mechanical, Electrical, Control Equipment and Service General Contracting (MEC) Project for Guangdong Province Reserve Grain Shantou Direct Warehouse Phase II Project
CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view
To view hidden content (*), please log in first
The Machinery, Electrical, Control Equipment, and Services General Contracting (MEC) Project for the Second Phase of the Shantou Grain Reserve Warehouse in Guangdong Province [Electronic Bid] Investment Project Code 2206-440507-01-558570 Investment Project Name: Shantou Grain Reserve Warehouse Phase II Project Bidding Project Name: Shantou Grain Reserve Warehouse Phase II Engineering Machinery, Electrical, Control Equipment, and Services General Contracting (MEC) Project Section (Package) Name: Shantou Grain Reserve Warehouse Phase II Engineering Machinery, Electrical, Control Equipment, and Services General Contracting (MEC) Project Announcement Nature: Normal Qualification Review Method: Post Qualification Review Bidding Project Implementation (Delivery) Location: Shaoshan Road North Railway Station, Outing Street, Longhu District, Shantou City, Guangdong Province On the east side, there is the Shantou direct warehouse site of Guangdong Provincial Grain Reserve Management Group Co., Ltd. Source of Funds State owned or Collective Investment Source of Funds Composition of State owned or Collective Investment 100.00% Scope and Scale of Tender Guangdong Province Reserve Grain Shantou Direct Warehouse Phase II Engineering Machinery, Electrical, Control Equipment and Service General Contracting (MEC) Project, including 14 large-diameter silos with a total capacity of 200000 tons, work towers, automobile distribution stations (including hydraulic flippers), one-stop service rooms, mechanical warehouses, and all related contents of grain inlet and outlet processes, mechanical, electrical, control, intelligent equipment manufacturing, supply, installation, commissioning, training, after-sales service, etc., as well as equipment procurement, installation, commissioning, and integration with existing intelligent systems for temperature control air conditioning, air conditioning, grain situation measurement and control, fiber optic temperature measurement, power monitoring, security monitoring, etc. Connection control, etc. Please refer to Volume 2 Technical Section of this bidding document for details. The bidding content for the Machinery, Electrical, Control Equipment, and Service General Contracting (MEC) project of the Shantou Grain Reserve Warehouse Phase II in Guangdong Province includes but is not limited to the following: 1. Installation and commissioning of all process equipment (conveying equipment, lifting equipment, etc.), power and control cables, equipment support steel structure platforms, and non-standard components; 2. Procurement, installation, and reporting of hydraulic flippers, as well as related supporting cables and equipment; 3. The contractor is responsible for connecting the lightning protection grounding of the equipment (to the lightning protection connection box made by the civil engineering); 4. Steel frame structure support; 5. The procurement, installation, commissioning, and connection control of temperature controlled air conditioning, air conditioning (including nitrogen generators, pipelines, and control systems), grain monitoring and control, fiber optic temperature measurement, power monitoring, security monitoring equipment, and other equipment with existing intelligent systems (all of which need to be integrated with Phase I and connected to the already built intelligent system in the warehouse); 6. The dust collector pipeline network is integrated and perfected; 7. The distribution cabinets of the corresponding equipment mentioned above, the supporting production equipment in the central control room (including a 12 square meter LED display screen and central control console), and the communication facilities from the central control room to the distribution room (including wiring and supporting facilities); Construction period (delivery time): The total construction period of this project is 330 calendar days, with a maximum bidding limit of 10000 yuan. Whether to accept consortium bidding is a requirement for bidding qualification and ability. The bidder's qualification requirements are: the bidder must have a first-class qualification for general contracting of mechanical and electrical engineering construction or a first-class qualification for professional contracting of building mechanical and electrical installation engineering issued by the construction administrative department within the validity period; Qualification requirements for project leader: The project leader proposed by the bidder (in the case of consortium bidding, shall be jointly appointed by the bidder)