广东International Respiratory Medicine Center - Supplementary Announcement on Construction General Contracting of International Respiratory Medicine Center

CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view

To view hidden content (*), please log in first

Supplementary Announcement for Construction General Contracting of International Respiratory Medical Center Supplementary Announcement for Construction General Contracting of International Respiratory Medical Center Supplementary Announcement for Construction General Contracting of International Respiratory Medical Center [Project Number: JG2025-1691] The bidding project for the International Respiratory Medical Center Construction General Contracting [Project Number: JG2025-1691] was announced on April 19, 2025. The relevant content of the original bidding documents is now adjusted as follows: 1. Amendment to the bidding documents: Serial Number, Clause Number, Original Text 1 Chapter 2 Bid Opening, Evaluation, and Evaluation Methods, Appendix 4 (Technical Bid Detailed Review Scoring Table). Please refer to the bidding documents for details. Please refer to Appendix 1 of this supplementary announcement for the details of the modifications. 2、 The originally scheduled bid registration time, bid document submission time, electronic CD backup submission time, bid document decryption time, bid opening time, and venue arrangement for this project have been modified. For specific time and venue arrangements, bidders are advised to closely monitor the schedule of this project published by Guangzhou Public Resource Trading Center. Bidders can log in to the homepage of Guangzhou Public Resource Trading Center website, click on the“ Transaction Business - Construction Engineering; In the column,“ Project inquiry (schedule, Q&A minutes);, Enter the project number or project name to search for the latest information. 3、 This supplementary announcement is an integral part of the bidding documents. If the expression of the same matter is inconsistent with the previously issued bidding documents, this supplementary announcement shall prevail. Attachment: Attachment 1, Attachment 4 (Technical Bid Detailed Review Scoring Table) (Revised Version) Tenderer: Guangzhou Key Public Construction Project Management Center Tendering Agency: Beijing CCCC Construction Engineering Consulting Co., Ltd. April 23, 2025 Attachment 1, Attachment 4 (Technical Bid Detailed Review Scoring Table) (Revised Version) Project Name: Serial Number Scoring Project Scoring Content Score Evaluation Standard 1 Enterprise Credit (30 points) Enterprise Performance 10 Bidders who have completed similar projects with qualified quality from January 1, 2020 to the bidding deadline: 1. If the number of completed achievements is 15 or more, 10 points will be awarded; 2. If the number of completed achievements is between 8 and 14, 5 points will be awarded; 3. If the number of completed achievements ranges from 1 to 7, 1 point will be awarded. Note: Those who do not meet the above conditions will not be scored, and this item will receive a maximum of 10 points. 10 bidders who have won the building construction project quality award from January 1, 2020 to the deadline for bidding: 1. Those who have won the national engineering quality award will receive 2 points for each item, with a maximum of 10 points; 2. Those who have won the provincial engineering quality award will receive 1 point for each item, with a maximum of 5 points; 3. Those who have won the municipal engineering quality award will receive 0.2 points for each item, with a maximum of 1 point. Note: Those who do not meet the above conditions will not be scored, and this item will receive a maximum of 10 points. The highest award for the same engineering project shall be counted once and not cumulatively. Engineering research and development capability: Bidders who have obtained provincial-level or above housing construction methods from January 1, 2020 to the bidding deadline will receive 0.5 points for each item, with a maximum score of 5 points. Note: Those who do not meet the above conditions will not be scored, and this item will receive a maximum of 5 points. Third party evaluation: 5 bidders who have obtained provincial-level or above construction technology innovation enterprises from January 1, 2020 to the bidding deadline will receive 5 points. Note: Not in compliance with the above
View hidden content