北京Announcement of Bid Winning Candidates for the Phase II Project (Survey) of Collective Land Rental Housing in Henan Village, Renhe Town, Shunyi District
CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view
To view hidden content (*), please log in first
Detailed Content Template Start -------------------------------------------------------------------------------? Announcement Content: The bidding candidate for the second phase of the collective land rental housing project (survey) in Henan Village, Renhe Town, Shunyi District has been announced. Tender Number: S1, 000A001040171002. The start time of the announcement is April 14, 2025 at 17:00:00. The end time of the announcement is April 17, 2025 at 17:00:00. This is the second phase of the collective land rental housing project (survey) in Henan Village, Renhe Town, Shunyi District. Tender Project Number: S110000A001040171002), After evaluation by the Bid Evaluation Committee, the winning bidder candidate has been determined and is now publicly announced as follows: 1. Basic information of the winning bidder candidate 1. Ranking of the winning bidder candidate names Bid price/yuan Quality cycle/day 1. Beijing Hanbolin Remote Sensing Mapping Information Engineering Research Institute 734760.6 meets current national and local industry standards, bidding document requirements, and actual engineering needs 302. Beijing Speed Measurement Information Technology Co., Ltd. 1296129.6 meets current national and local industry standards, bidding document requirements, and actual engineering needs 303. Beijing Zhongcheng Infrastructure Engineering Testing Technology Co., Ltd. 613846.8 meets current national and local industry standards, bidding document requirements, and actual engineering needs 302 The winning bidder candidates shall be ranked according to the project leader committed to in accordance with the requirements of the bidding documents. The name of the winning bidder candidate shall be the name of the project leader, the name of the relevant certificate, and the relevant certificate number shall be 1. Beijing Hanbolin Remote Sensing Mapping Information Engineering Research Institute, Wang Jianming, Registered Civil Engineer (Geotechnical) AY1114002662. Beijing Speed Measurement Information Technology Co., Ltd., Cao Shutang, Registered Civil Engineer (Geotechnical) AY0611000313. Beijing Zhongcheng Infrastructure Engineering Testing Technology Co., Ltd., Qiu Plan, Registered Civil Engineer (Geotechnical) AY1141003863 Ranking of Qualification and Ability Conditions for Bid Winning Candidates in Response to the Bidding Documents: 1. Beijing Hanbolin Remote Sensing Mapping Information Engineering Research Institute fully responds to the requirements of the bidding documents. 2. Beijing Speed Testing Information Technology Co., Ltd. fully responds to the requirements of the bidding documents. 3. Beijing Zhongcheng Infrastructure Engineering Testing Technology Co., Ltd. fully responds to the requirements of the bidding documents If a bidder or other interested party has objections to the evaluation results of this bidding project, they shall submit a written objection document with the official seal of the unit to the tenderer or bidding agency in writing during the public announcement period of the winning candidate,