北京Announcement on Pre Qualification Review of Power Engineering Construction for the New Factory and Auxiliary Buildings Project at No. 12 Keji Road, Miyun Economic Development Zone, Beijing

CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view

To view hidden content (*), please log in first

Detailed Content Template Start -------------------------------------------------------------------------------? Announcement Content: The power engineering construction bidding for the new factory building and ancillary buildings project at No. 12 Keji Road, Miyun Economic Development Zone, Beijing has been approved for construction by the Economic and Information Bureau of Miyun District, Beijing with the approval number Jingmi Jingxin [2024] 17. The construction unit is Beijing Zhongguancun Miyun Park Development Group Co., Ltd., and the construction site is No. 12 Keji Road, Miyun Economic Development Zone. The construction funds are self raised by state-owned enterprise units (local), with a contribution ratio of 100%. The power engineering project for the new factory building and ancillary buildings at No. 12 Keji Road, Miyun Economic Development Zone, Beijing, which is required for the overall construction of the Tit2end project, has met the bidding conditions. The bidder is China Construction Sixth Engineering Bureau Co., Ltd., and the bidding agency is Beijing Yuanjing Hengtong Engineering Cost Consulting Co., Ltd. The bidding is now open and interested potential bidders (hereinafter referred to as the applicant) are invited to submit pre qualification applications. Tit2end2. Project Overview and Bidding Scope 2. Subcontracting Project Overview and Bidding Scope end2.1 The name of the subcontracting project in this profession is the power engineering of the new factory building and ancillary buildings project at No. 12 Keji Road, Miyun Economic Development Zone, Beijing. 2.2 The total construction scale of the subcontracting project in this profession is 31575.97m2, and the estimated contract price is 6 million yuan. 2.3 The construction location of the subcontracting project in this profession is No. 12 Keji Road, Miyun Economic Development Zone. 2.4 The construction period of the subcontracting project in this profession is required to be 134 calendar days. 2.5 The bidding scope of the subcontracting project in this profession includes equipment, lines, pipelines, seismic support engineering, etc. within the scope of the professional contracting qualification for building mechanical and electrical installation engineering. (The specific content includes: switches, lighting fixtures, wires, piping, low-voltage distribution boxes, seismic supports, etc. within the scope of the drawings for the new factory building and ancillary buildings project on the 12th.) 2.6 Other/tid2end3. Qualification requirements for applicants: Qualification requirements for bidders: end3.1 Qualification pre-approval requirements for subcontracting projects in this field: Applicants must have a third level [new] or higher qualification for professional contracting of building mechanical and electrical installation engineering, with recent/year/performance, and corresponding construction capabilities in personnel, equipment, funds, etc. Among them, the applicant's proposed project manager must have a second level or higher (including higher level) registered construction engineer qualification in mechanical and electrical engineering, have a valid safety production assessment certificate (B), and shall not serve as another registered construction engineer when determining the winning bidder. The project manager responsible for the construction project. 3.2 The pre qualification review of subcontracting projects in this profession does not accept (accept or reject) applications for joint venture qualification review. If a consortium is used to apply for pre qualification, the following requirements must be met: (1) All parties to the consortium must sign a consortium agreement in the format provided in the pre qualification documents, clarifying the consortium's involvement
View hidden content