北京Announcement on the Listing and Transfer of Construction Sand Mining Rights in Nanwan Village, Zhangyi Town, Yuanzhou District

CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view

To view hidden content (*), please log in first

Announcement on the Listing and Transfer of Construction Sand Mining Rights in Nanwan Village, Zhangyi Town, Yuanzhou District (Announcement No.: Original Natural Resources Announcement [2025] No. 3) Announcement on the Transfer of Construction Sand Mining Rights in Nanwan Village, Zhangyi Town, Yuanzhou District 1. Name of Transferor: Yuanzhou District Natural Resources Bureau Location: No. 235 Zhongshan North Street, Yuanzhou District, Guyuan City 2. Mining Rights Trading Platform Name: Ningxia Public Resource Trading Platform Natural Resource Element Trading Market Location: No. 51 Beijing Middle Road, Jinfeng District, Yinchuan City 3. Basic Information on the Transfer of Mining Rights -1 Project: Project __ko1744626844010="ko30" Project Name: Sand Mine-1 for Construction in Nanwan Village, Zhangyi Town, Yuanzhou District Mining type ":" Exploration type "" __ko1744626844010="ko33" Mining type: Construction sand Geographical location: Nanwan Village, Zhangyi Town, Yuanzhou District Area: 0.5924 square kilometers, turning point coordinates are as follows (2000 National Geodetic Coordinates): No. XY13969227.435595027.7623699357.983555844.4133968708.69596026.604396844.55355859.4553968683735595244.00 * 22562110-1 "__ko1744626844010=" ko66 "Resource reserves: 15.1734 million cubic meters (37.181 million tons) Mining elevation: 2256 meters to 2110 meters Resource development and utilization Situation: In open-pit mining and mining of mineral resources, a reasonable mining sequence and method should be adopted, and effective measures should be taken to ensure that the recovery rate, mineral processing recovery rate, and comprehensive utilization rate of mineral resources meet the relevant national standards. Requirements for mining geological environment protection and land reclamation: The mining right holder shall fulfill the obligations of mining geological environment protection and land reclamation in accordance with the approved mining ecological restoration plan, and deposit the mining restoration and management fund in accordance with relevant regulations, which shall be specifically used for mining ecological restoration. In the production process, if it is possible to mine and repair at the same time, it should be done simultaneously; For those that can be repaired in zones and stages, they should be repaired in zones and stages; If it is not possible to carry out mining, repair at the same time, or repair in zones or stages, timely repair should be carried out within a reasonable period before or after the closure of the pit. The ecological restoration obligation of the mining right holder shall not be exempted due to the loss of the mining right. Number: longitude and latitude 13969227.435595027.7623969357.9835595844.4133968708.69596026.604396844.5535595859.4553968668.3735595244.00 * 22562110. Survey work level: Survey investment requirements: Proposed transfer period: 12.5 years. Starting price: 53.1069 million yuan. Starting transfer yield:%. IV. Qualification conditions of bidders/bidders (1) Profit making laws registered in the People's Republic of China that can independently bear civil liability in accordance with the law
View hidden content