山东Public bidding for putty latex paint

CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view

To view hidden content (*), please log in first

Putty latex paint public bidding announcement date: April 24, 2025 Deadline: April 25, 2025 Contact person: Pan Jie Contact phone: 13046433323 Bidding requirements Construction period: 1. On the premise of ensuring quality, complete the construction quality within the construction period required by the project department. 1. According to the quality provisions of the general contract, the current national engineering acceptance standards, the quality requirements standards of Weijian Group, and the requirements of the project department for safe and civilized construction. 1.1. The labor subcontractor shall comply with the relevant management regulations of engineering construction safety production, strictly follow the safety standards for construction, and accept the supervision and inspection of industry safety inspectors in accordance with the law at any time. Necessary safety protection measures shall be taken to eliminate potential safety hazards. The responsibility for accidents caused by inadequate safety measures of the labor subcontractor and the resulting costs shall be borne by the labor subcontractor. 2. Each labor subcontractor shall provide unified construction safety training for their staff on the construction site before entering the construction site. Safety education shall be conducted once a month during the construction process, and they shall be responsible for their safety. 3. The first party is the general contracting unit of the project, responsible for the comprehensive management of safety production on the construction site. The second party is a subcontracting unit, responsible for safety production work within the subcontracting scope, strictly implementing relevant laws, regulations, national standards, industry standards and other relevant document requirements on safety production, and complying with the various rules and regulations of the first party's construction site safety management. 4. The second party must handle the employment procedures in accordance with the regulations of the first party regarding labor employment, provide the first party with relevant safety production qualifications and certificates, a list of labor personnel, and legal documents before entering the site, and accept the first party's review. 5. The first party shall fulfill its responsibilities for safety production management in accordance with relevant regulations of the country and Weihai City, Shandong Province. The first party shall provide project level safety education, training, and assessment to the personnel of the second party, keep records, and issue certificates for qualified training personnel. 6. The complete safety management information for subcontractor workers includes: certificates and qualified attendance records of the main person in charge and full-time safety management personnel on site, qualified records of entry education and training, safety technical disclosure records, and records of team safety activities. The labor subcontractor shall submit the ID cards and copies of the personnel entering the site to the project department. Our project department will organize personnel to conduct inspections. For each case where ID cards are not reported and insurance is not purchased, a fine of 1000 yuan per person will be imposed. If the labor subcontractor's personnel entering the factory have already obtained work-related injury insurance and provided insurance certificates that have been reviewed by the company, they can only use them. Otherwise, they need to purchase insurance uniformly. If the labor subcontractor needs the assistance of the project department to handle insurance, the insurance costs will be borne by the labor subcontractor themselves. All expenses incurred in the event of a work-related injury, as well as any loss of work expenses that are not reimbursed by the insurance company or incurred later, will be borne by the labor subcontractor themselves. Qualification: 1. Possess corresponding construction qualification management personnel. 1. Equip relevant management personnel. Other instructions in the bidding announcement. Details: Main job content, specifications, unit estimated workload, unit name, construction content, including equipment and instruments, calculation rules, mandatory management regulations. Note: 1. Interior wall putty/㎡ 5000.00 Weihai High altitude Zone Low altitude Economic Industrial Park Phase I and Infrastructure Supporting Project Site 2. Base cleaning (including dew point rust prevention treatment, etc.); Partial polishing and repair, painting of internal and external corners
View hidden content