陕西PC package for the second air shaft and ancillary works of Shanyang Coal Mine
CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view
To view hidden content (*), please log in first
Shanyang Coal Mine No.2 Wind Shaft and Ancillary Engineering PC Package Shaanxi Chenghe Shanyang Coal Mine Co., Ltd. Shanyang Coal Mine No.2 Wind Shaft and Ancillary Engineering PC Package Qualification Pre Qualification Announcement Section Number: E6100013501250134001001 Project Location: Weinan City, Shaanxi Province 1. Bidding Conditions Shanyang Coal Mine No.2 Wind Shaft and Ancillary Engineering PC Package has been approved and approved by the Shaanxi Provincial Development and Reform Commission in document Shaanxi Development and Reform Commission [2025] No. 404. The project funds are self raised by the enterprise, with a contribution ratio of 100%, and the funds have been secured. The bidder is Shaanxi Chenghe Shanyang Coal Mine Co., Ltd., and the bidding agency is Shaanxi Qinyuan Tendering Co., Ltd. The bidding project has met the bidding conditions and is now open for domestic bidding. We cordially invite potential applicants (hereinafter referred to as applicants) who are interested to participate. 2、 Project Overview and Bidding Scope 2.1 Project Name and Section Number: Shanyang Coal Mine No.2 Wind Shaft and Auxiliary Engineering PC Package (Section Number: E6100013501250134001001) 2.2 Project Overview: Due to the pressure of roads and villages on the third mining area of the mine, the service life of the third mining area has been shortened. According to the mine production continuity plan, the mine needs to arrange mining area continuity in the north area of the mine field. Therefore, our company needs to add a new wind shaft project. 2.3 Bidding Scope: The construction content mainly includes: (1) Mining construction projects: construction of shaft engineering and ventilation system engineering; (2) Civil engineering: construction preparation engineering, ventilation system engineering, safety technology and control system engineering (excluding ground gas extraction system), power supply system engineering, ground transportation engineering, outdoor water supply and drainage and heating engineering, administrative welfare facility engineering, and site facility engineering; (3) Equipment procurement and installation projects for construction preparation engineering, drainage system engineering, ventilation system engineering, safety technology and monitoring system engineering (excluding ground gas extraction system), communication system engineering, power supply system engineering, outdoor water supply and drainage and heating engineering, and site facility engineering. 2.4 Construction location: Shanyang Coal Mine, Heyang County, Weinan City, Shaanxi Province. 2.5 Planned construction period: The total planned construction period is 630 calendar days, and the planned start date: The actual start date shall be subject to the written notice from the tenderer. 2.6 Quality requirements: Meet the unified standard for construction project quality acceptance and the qualified level. 3、 Applicant Qualification Requirements 3.1 Qualification Requirements: (1) The applicant must be a legal person or other organization registered in accordance with the law within the territory of the People's Republic of China, and provide a valid business license or other legal registration certificate; (2) The applicant must have a first level or higher qualification for general contracting of mining engineering construction and a safety production license issued by the construction administrative department. 3.2 Financial Requirements: The applicant must provide annual financial audit reports and financial statements (including balance sheets, income statements, cash flow statements, financial statements, etc.) audited by third parties in recent years (2021, 2022, 2023 for three consecutive years). Enterprises established after 2023 are not required to provide annual financial audit reports or financial statements audited by third parties, but must provide a valid credit certificate issued by the bank for their basic account (issued after January 1, 2025) and a bank statement