广东Bidding Announcement for General Contracting of Construction of New Teaching Complex Building at Guangzhou No.89 Middle School [Electronic Bid]

CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view

To view hidden content (*), please log in first

Announcement of General Contracting for Construction of New Teaching Complex Building at Guangzhou No.89 Middle School [Electronic Bid] Investment Project Code 2312-440106-04-493369 Investment Project Name: Guangzhou No.89 Middle School New Teaching Complex Building Project Bidding Project Name: Guangzhou No.89 Middle School New Teaching Complex Building Project Construction General Contracting Section (Package) Name: Guangzhou No.89 Middle School New Teaching Complex Building Project Construction General Contracting Announcement Nature: Normal Qualification Review Method: Qualification Post Review Bidding Project Implementation (Delivery) Location: The project is located at No. 1219 Tianyuan Road, Tianhe District, Guangzhou, in the southern campus area of Guangzhou No.89 Middle School. Source of Funds: Fiscal Investment (District Level) Source of Funds: Composition of Fiscal Investment (District Level 100.00%) Scope and Scale of Bidding: This project involves the demolition of Building 8, outdoor swimming pool, abandoned changing rooms, and abandoned electrical rooms on campus, with a total demolition area of approximately 1200 square meters. Construct a new teaching comprehensive building with an area of 7770 square meters, including 6075 square meters of above ground construction and 1695 square meters of underground construction; Construct approximately 185 meters of new school roads and renovate approximately 215 meters of school roads. The highest building height of this project is 23.5 meters, the maximum single span is 25.1 meters, and the deepest foundation pit depth is 7.90 meters. The total investment of this project is 49963422 yuan, including engineering costs of 4314677504 yuan, other construction costs of 536140166 yuan, and contingency funds of 145524530 yuan. The bidding content of this project includes (1) underground engineering (earthwork engineering, foundation pit support engineering, foundation engineering, basement main structure engineering, basement decoration engineering, underground electrical engineering, underground water supply and drainage engineering, underground fire water engineering, underground fire electrical engineering, underground ventilation and air conditioning engineering, underground hot water engineering, underground swimming pool system, human waterproofing engineering, human air defense electrical engineering, human air defense ventilation engineering, underground intelligent engineering), (2) above ground engineering (above ground main structure engineering, indoor decoration engineering, facade engineering, above ground electrical engineering, above ground water supply and drainage engineering, above ground fire water engineering, above ground ventilation and air conditioning engineering, above ground swimming pool system, above ground hot water engineering, above ground Intelligent Engineering, Elevator Engineering), (3) Outdoor engineering (outdoor roads and squares, greening engineering, outdoor lighting engineering, outdoor greening water supply engineering, outdoor water supply engineering (including permanent water engineering), outdoor drainage engineering, outdoor external water drainage engineering, outdoor fire electrical engineering, external power access engineering, outdoor intelligent engineering), (4) other engineering (identification engineering, fence engineering, demolition engineering, basketball court repair, temporary enclosure, high and low voltage distribution engineering, seismic support and hanger, septic tank, solar photovoltaic engineering, double-layer non motorized vehicle frame, pipeline relocation, temporary power engineering, temporary water engineering), etc. Including but not limited to the construction preparation and construction of all engineering contents within the design scope of this bidding project, preparation of completion drawings, cooperation with relevant departments for settlement and review, engineering warranty, etc., organizing the acceptance filing and engineering data collection and filing of this project, responsible for handling various procedures required for project commencement and acceptance, and undertaking the construction party's handling of the above procedures
View hidden content