安徽[Anhui Construction Engineering Third Construction] Construction Engineering Third Construction Installation Company High tech Zone Science and Technology University Silicon Valley High tech Incubation Park Phase II Installation Project Water Supply and Drainage Pipe and Accessories Section 1 Procurement Announcement

CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view

To view hidden content (*), please log in first

According to the requirements of the "Procurement Measures for Engineering Materials and Equipment of Anhui Construction Engineering Group" and the "Procurement Management Measures for Anhui Construction Third Construction Group Co., Ltd.", we are now conducting a public inquiry and procurement of drainage pipes for the installation project of the second phase of the Silicon Valley High tech Incubation Park in the High tech Zone. All bidding units are requested to provide quotations according to the requirements. Choose a reasonable low price to win the bid under the same conditions. This quotation form shall come into effect after being stamped by the quoting unit. 1、 Project Overview Project Name and Procurement Content: Drainage Pipe Installation Project for Phase II of the High tech Zone Science and Technology University Silicon Valley High tech Incubation Park Tender Number: ACEG-202504981001 Project Address: This project has a building area of 116600 square meters and is located at the southeast corner of the intersection of Changning Avenue and Fuxing Road in the High tech Zone of Hefei City; There are a total of 7 individual buildings above ground, including B05 # office building (16 floors above ground), B06 # office building (16 floors above ground), B07 #, B08 # office building (5 floors above ground), C04 # commercial building (6 floors above ground), C05 # business hotel (14 floors above ground), and C06 # commercial building (1 floor above ground), with 1 floor underground. Except for C06 # commercial building, a total of 6 individual buildings adopt prefabricated construction for their aboveground parts, with an assembly rate of not less than 30%. The construction period is 960 days. 2、 Qualifications of the quoting unit: 1. The company is legally registered, independent legal person, has a business license and basic account certificate; 2. After the issuance of the bid winning notice and before the signing of the contract, if the bidder has the following adverse conditions or bad credit records, the tenderer has the right to cancel the bidder's bid winning qualification: (1) On the "China Execution Information Disclosure Network“( http://zxgk.court.gov.cn/zhzxgk/ )There is information about the executed person's case in the middle; (2) Those who are blacklisted in the "Construction Group Blacklist Management System"; 3. Similar performance requirements: Bidders must have at least one similar performance in pipe materials worth no less than 100000 yuan in the past three years (from January 2022 to present). 4. Participating in the quotation is considered a complete response to all requirements within the contract terms provided by us; 5. Limited brands: Zhejiang Zhongcai (Zhejiang Zhongcai Pipe Industry Co., Ltd.), Huaya (Huaya Wuhu Plastic Co., Ltd.), Jinde (Jinde Pipe Industry Group), Liansu (Guangdong Liansu Technology Group), Junxing Pipe Industry (Tianjin Junxing Pipe Industry Group Co., Ltd.), ERA AD (Yonggao Co., Ltd.).; 3、 1. For those who intend to participate in bidding and meet the qualification requirements, please log in to the Anhui Construction Engineering Electronic Procurement Platform before the bidding deadline, find the corresponding project, download the inquiry and leasing documents, and register and quote online. After stamping the inquiry form, scan it as an attachment and upload it to the system. Bidders are responsible for the clarity, and those with unclear and unrecognizable key handwriting will be treated as invalid bids. 2. Planned construction period: meet the project schedule and the requirements of the tenderer; 3. The bidding document fee is 100 yuan/copy (non refundable); The electronic procurement platform of Anhui Construction Engineering Group has been registered and passed the final review (without the need to apply for a CA lock). 4. Bid security deposit: The bid security deposit for this project is RMB 3000 (¥ 3000.0). When the bidding project consists of multiple sections and bidders bid for two or more sections simultaneously, the bid security deposit does not need to be duplicated
View hidden content