河北Tender Announcement for EPC General Contracting of 150 ton Steel Slag Rolling Crushing Upgrade and Transformation Project of Plate and Strip Division

CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view

To view hidden content (*), please log in first

Project Number: GC130800202500098 Bidding Method: Public Bidding Bidding Bidding Document Acquisition Method: Online Document Acquisition Deadline: April 29, 2025 9:00:00 Submission of Questions Deadline: May 4, 2025 9:00:00 Deposit Payment Deadline: May 4, 2025 9:00:00 Bid Opening Time: May 4, 2025 9:00:00 Formal Announcement 1. Bidding Conditions: This project, a 150 ton steel slag roll crushing and upgrading project of the Plate and Belt Division, has been filed with the Shuangluan Approval Investment Record [2025] No. 20 document at the Shuangluan District Data and Government Service Bureau in Chengde City. The bidder is Hebei Iron and Steel Co., Ltd. Chengde Branch, and the bidding project funds are self raised by the enterprise, with a contribution ratio of 100%. The project has met the bidding conditions and is now open for bidding for the EPC general contracting of the project. 2. Project Overview and Bidding Scope 2.1 Project Overview: Bidding Project Name: EPC General Contracting for the 150 ton Steel Slag Rolling Crushing and Upgrading Project of the Plate and Strip Division. Construction location: within the factory area of Chengde Branch of Hebei Iron and Steel Co., Ltd. Construction period: Within 150 calendar days from the date of contract signing, the project shall be completed and put into use. All formal design blueprints shall be delivered within 30 calendar days, and the design progress shall not affect the on-site construction progress. Quality standards: Design, equipment, safety, environmental protection, and construction quality shall be inspected and accepted in accordance with current national standards and contract requirements to meet the qualified engineering standards. Project scope: The main project content includes but is not limited to the construction of a 150 ton slag conversion span for the Plate and Strip Division, and the establishment of a new roller crushing production line with an annual processing capacity of 450000 tons of steel slag; New dust removal system for steel slag rolling crushing equipment, utilizing a 400000 air flow wet dust collector from an old slag yard, and optimizing the dust collector; The construction of related auxiliary equipment and facilities for civil engineering, steel structure, electrical, automation, water supply and drainage, and other specialties supporting the new roller crushing device; Leveling, hardening, and greening the site roads and ground. The above engineering quantities are subject to the actual site conditions and meet the requirements of the bidding documents. For specific requirements, please refer to the "Technical Specifications" in the bidding documents. 2.2 Bidding Scope: This bidding project is an EPC general contracting, which is a turnkey project; This includes all the work involved in this project, including design, equipment procurement, material procurement, building installation and construction, equipment installation and commissioning, technical services, completion acceptance, quality warranty, safety facility design, occupational disease prevention facility design, fire protection special section, etc. 3. Qualification Requirements for Bidders 3.1 This bidding requires bidders to possess the following qualifications: 3.1.1 Qualification Requirements: independent legal entity registered within the territory of the People's Republic of China in accordance with the law, and have corresponding performance capabilities in personnel, equipment, funds, and other aspects; And at the same time, possess the following design and construction qualifications: Design qualification: possess the comprehensive Class A qualification for engineering design issued by the construction administrative department, or the Class A qualification for metallurgical industry (metal smelting engineering), or the special Class A design qualification for environmental engineering (air pollution prevention and control engineering). (2) Construction qualification requirements: Possess a first level (including) or higher qualification for metallurgical engineering construction general contracting issued by the construction administrative department
View hidden content