上海Anhui Company Bengbu Power Plant Phase I Industrial Wastewater Centrifugal Dehydrator Maintenance Inquiry and Procurement
CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view
To view hidden content (*), please log in first
Title: National Energy Group Materials Co., Ltd. Shanghai Branch Inquiry Form 2022-04-240 8:47:38 Initiate Consultation/Objection/Complaint for an Item Project Name: Anhui Company Bengbu Power Plant Phase I Industrial Wastewater Centrifugal Dehydration Machine Maintenance Inquiry Procurement Agency: National Energy Group Materials Co., Ltd. Shanghai Branch Procurement Number: WZSH-SGXJ-2025040639 Purchaser: National Energy Bengbu Power Generation Co., Ltd. Qualification Requirements for the Bidder: The bidder must also meet the following qualification certificates: 1. Construction Enterprise Qualification Certificate - Power Engineering Construction General Contracting - Level 3 or Construction Enterprise Qualification Certificate - Building Mechanical and Electrical Installation Engineering Professional Contracting - Level 3 2. Safety Production License - Construction. Performance requirements of the bidder: The bidder must meet the following performance requirements: 1. The bidder must provide at least one contract for centrifugal dewatering machine maintenance or installation projects in the past three years (from January 1, 2022 to the deadline for quotation). The bidder must provide a scanned copy of the performance contract that meets the procurement requirements, which must include the procurement scope, contract signing time, and the stamped pages of both parties. Performance certification documents not provided in accordance with the above requirements are invalid certification documents. Procurement Method: Inquiry Procurement Inquiry Method: Public Inquiry Material Classification: Service Category - Production Services; Service category - comprehensive services; Service category - survey and design; Engineering - Hydroelectric Engineering; Service category - technical consulting services; Service category - property services; Engineering - General Engineering Construction; Service category - Other; Engineering - Thermal power (including gas turbine) engineering; Main technical requirements: This project requires maintenance of the company's industrial wastewater # 1 and # 2 centrifugal dewatering machines to eliminate issues such as high equipment failure rates, severe wear of the mud nozzle, cracks in some differential shafts, and decreased output in the industrial wastewater system # 1 and # 2 centrifugal dewatering machines. The maintenance items within the procurement scope include equipment disassembly and cleaning, replacement of vulnerable parts, bearings, wear-resistant protective sleeves for discharge ports, dynamic balancing of drums, screws, etc., maintenance of differential systems, and disassembly and maintenance of three sludge pumps. The contracting method for this project is labor and materials. Two items were published by Yang Weidong. Quotation method: Full order contact phone number: 4000104000-17826. Publication time: April 24, 2025 at 8:47:38. Quotation deadline: April 27, 2025 at 10:00:00. Payment method: wire transfer, acceptance bill. Freight accepted by the supplier. Objection contact person: Zhu Yudi. Attachment: Objection. Recipient: China National Energy Group Materials Co., Ltd. Shanghai Branch. Remarks: 1. Technical and business documents, "Important Warning - Must See", "Notice on Payment of Transaction Service Fees" and other requirements are detailed in the attachment. 2. Please provide quotation business documents and technical documents according to the requirements of the inquiry document (delivery time and payment method shall be subject to the procurement document). 3. Reminder: For all projects that require mandatory national licensing qualifications, the procurement agency will conduct verification on relevant government websites. If any fraud is found, it will be assessed in accordance with the Supplier Dishonest Behavior Management Measures. 4. The successful supplier must sign a contract with the project unit based on the service fee payment receipt, and the contract terms shall be in accordance with the project unit contract