新疆Announcement of Bid Winning Results for the Procurement of High Voltage and Low Voltage Power and Control Cables for the Off site Coal Transportation System (Co construction Section) of Xinjiang Heavy Energy Shitoumei 21 MW Coal Power Project and Xinjiang Huadian Hami 21 MW Coal Power Project

CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view

To view hidden content (*), please log in first

The bidding results for the procurement of high-voltage and low-voltage power cables and control cables for the off-site coal transportation system (co construction section) of the Xinjiang Heavy Energy Shitoumei 2 × 1 million kW coal-fired power project and the Xinjiang Huadian Hami 2 × 1 million kW coal-fired power project have been announced through public bidding. The bidding results are as follows: (Z) SZBJG202504240001. The bidding price for the procurement of high-voltage and low-voltage power cables and control cables for the off-site coal transportation system (co construction section) of the Xinjiang Heavy Energy Shitoumei 2 × 1 million kW coal-fired power project and the Xinjiang Huadian Hami 2 × 1 million kW coal-fired power project has been announced. The bidding results for the bidding section (section number: S01035925 SZ0001P1) are announced as follows: Name of the winning bidder. Bid price. Bid winner: Shenxing Cable Group Co., Ltd. Company 10491225.80 yuan Remarks: Bidder: Xinjiang Heavy Energy Power Development Co., Ltd. April 24, 2025
View hidden content