北京Beijing Tongzhou District Nanhuofa Rental Housing Water Supply Guarantee Project

CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view

To view hidden content (*), please log in first

Pan North China Grabbing Project 223F0SG202500020 [Project Number: 223F0SG202500020] Beijing Tongzhou District Nanhuofaji Rental Water Supply Guarantee Project Construction Pre Qualification Announcement 1. Bidding Conditions This project, Beijing Tongzhou District Nanhuofaji Rental Water Supply Guarantee Project, has been approved for construction by the Development and Reform Commission of Tongzhou District, Beijing under Jing Tong Zhou Fa Gai (Nuclear) [2024] No. 114. The tenderer is Grand Canal (Beijing) Water Supply Co., Ltd., and the construction funds are self raised by state-owned enterprise units (local), with a project investment ratio of 100%. The bidding agency is Beijing Huitianyu Engineering Management Co., Ltd. The project has met the bidding conditions and is now open for bidding. Invite interested potential bidders (hereinafter referred to as applicants) to submit pre qualification applications. 2. Project Overview and Bidding Scope 2.1 Construction Site of the Project: Zhangjiawan Town, Tongzhou District 2.2 Construction Scale of the Project: 863.1 meters of DN300mm water supply pipeline outside the water plant on the north side of the existing main canal along Huotai Road, 4343.3 meters of DN200-DN400mm water distribution pipeline will be built along the existing Niuxiang Road, Tianbai Road, and Luxi Road, with an estimated contract price of 19.146 million yuan. 2.3 Construction Period Requirements of the Project: 70 calendar days. 2.4 Division of the Project Sections 2.4 Bidding Scope of the Project: 863.1 meters of DN300mm water supply pipeline outside the water plant on the north side of the existing main canal along Huotai Road, and 4343.3 meters of DN200-DN400mm water distribution pipeline will be built along the existing Niuxiang Road, Tianbai Road, and Luxi Road. The N400mm water distribution pipeline is 4343.3m long, including excavation of pipe trenches, pipeline laying (including excavation, pipe pulling, and pipe jacking construction processes), installation of gates, and masonry of well chambers The construction of road surface restoration, pipeline flushing and disinfection, as well as all the contents shown in the construction drawings and bill of quantities. 2.5 Other/3. Qualification Requirements for Applicants 3.1 The pre qualification of this project requires the applicant to have a third level [new] or above qualification for general contracting of municipal public works construction,/(similar project description in recent years) performance, and corresponding construction capabilities in personnel, equipment, funds, etc. Among them, the applicant's proposed project manager must have a second level or above registered construction engineer qualification for municipal public works and a valid safety production assessment certificate (B version), and shall not serve as a project manager for other ongoing construction projects when determining the winning bidder. 3.2 The pre qualification of this project does not accept applications for joint venture pre qualification. If a consortium applies for pre qualification, the following requirements must be met: (1) Each party of the consortium must sign a consortium agreement in the format provided in the pre qualification documents, clarifying the rights and obligations of the consortium leader and each party; (2) Each party of the consortium shall not participate in the pre qualification review in the same bid section in their own name or by joining other consortia. 3.3 Each applicant may submit a pre qualification application for/of the above-mentioned sections, but a maximum of/section is allowed to win the bid. 3.3 Other requirements:/. 4. Applicant's credit requirements 4.1 Dishonest executed person: The pre qualification review of this project adopts a veto (restrictive/veto) punishment method for dishonest executed persons. 4.2 Construction Safety Risk Enterprises: The pre qualification review of this project is crucial for construction
View hidden content