四川Gansu Rare Earth Metal Workshop May 2025 Material Demand Full Face Tray Bidding Procurement 2025.4.24.xlsx
CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view
To view hidden content (*), please log in first
This project is exclusively released by Longdao platform. If it is a China National Building Materials project, Gansu Rare Earth Metal Workshop will have a full face tray bidding procurement for material demand in May 2025. Project number: CG2025042400036 Buyer: Gansu Rare Earth New Materials Co., Ltd. Release time: April 24, 2025 8:48:10 Project status: In progress Project signature usage rules: Off board supplier quotations must use project signatures Quotation deadline: Procurement product information serial number Procurement product name specification unit 1 Wooden pallet Wooden pallet | 800 × 800 × 85 | Pine wood full face with cover plate | Project description: Electronic platform Bidding announcement 1. Bidding basis Based on the May 2025 demand plan for perforated mesh steel strip composite pipes in Gansu Rare Earth 204 workshop, we are now conducting a "full network open" bidding through the Longdao Cloud bidding and procurement platform. The bidder is Gansu Rare Earth New Materials Co., Ltd. 2. Project Overview: Gansu Rare Earth 204 Workshop May 2025 Material Requirements: Bidding for the Procurement of Perforated Mesh Steel Strip Composite Pipes. The content is as follows, and the details can be found in the bidding "Basic Information of Procurement Projects and Procurement Products" on the Longdao Cloud Procurement Platform. The name, specifications, model, unit quantity, and quotation of the subject matter in the section (including tax, one package, price upon delivery) are listed in batch 13 of the uploaded documents. The bidder qualification requirements are 3.1, which is an independent legal entity registered within the territory of the People's Republic of China; 3.2 Have good bank credit and commercial reputation, have the ability to fulfill contracts, and have not cheated on winning bids or seriously breached contracts in the past three years; 3.3 Qualification Requirements: The bidder's business scope includes the authority to operate the subject matter; Bidders shall give priority to qualified rare earth suppliers from Gansu under the same conditions, and have a supply performance of more than one year, with good guarantee capabilities. 4. The quality standard is based on the "Gansu Rare Earth Quality Standard". If there is no quality standard, the quality requirements of the subject matter shall be followed, and it shall comply with the Q/ZFH04-2019 standard: specifications and models of perforated steel strip composite pipes can be found in the uploaded file, and the quality shall be guaranteed according to the technical parameters and brand quotation. Brand: Sichuan Xinzhongtai, 5. Delivery deadline. The bidding requirements clearly indicate the delivery deadline and brand manufacturer. Bid rejected without specifying delivery date. 6. Payment method: After the goods arrive and pass the acceptance inspection, a 13% value-added tax special invoice will be issued, and installment payment (acceptance) will be made on credit. 7. The bidding requirement is to use online bidding method, and multiple rounds of quotations (3 times) can be made before the deadline. 8. The bidding deadline is 48 hours. Bidders are required to upload the 'Bid Response Commitment Letter'. Suppliers participating in the quotation are required to upload a 'Bid Response Commitment Letter'. And indicate the quality standards and shelf life as required in the attachment; Response payment method; Delivery deadline; Response to the winning bid method; Bid winning commitment. Failure to submit the "Bid Response Commitment Letter" as required shall be deemed as an invalid quotation. 10. Other bidding requirements: ① The quotation must not have any missing or omitted items; ② Filling in a unit price of 0 is considered as free supply from the supplier; ③ If the supplier's own reasons result in unsuccessful quotation on the electronic procurement trading platform, failure to upload bidding materials, and unsuccessful uploading and quotation, the supplier shall bear all consequences; ④ The quoted IP address is the same,