江苏Full process tracking audit and completion settlement audit of Gulf Cloud Environment project

CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view

To view hidden content (*), please log in first

The bidding announcement for the full process tracking audit and completion settlement audit of the Gulf Cloud Environment project includes: 1. Bidding conditions. The Gulf Cloud Environment project has been approved for construction by the Lianyungang Lianyungang City Lianyungang District Administrative Approval Bureau with the approval number of Lianqu Xingshen Bei [2023] 46; The bidder is Lianyungang Tongtai Real Estate Co., Ltd., with 100% self raised construction funds. The project now meets the bidding conditions. Jiangsu Wanda Engineering Cost Agency Co., Ltd. (bidding agency) is entrusted by the tenderer Lianyungang Tongtai Real Estate Co., Ltd. to conduct a public bidding for the full process tracking audit and completion settlement audit of this Gulf Cloud Environment project. 2、 Project Overview and Bidding Scope 2.1 Project Name: Full Process Tracking Audit and Completion Settlement Audit of Gulf Cloud Environment Project 2.2 Project Number: HXJY11100010354210012.3 Construction Location: South of Beigu Mountain Road, Lianyun District, northeast of Tangli Reservoir. 2.4 Project Scale: This project is located in Lianyungang City, with a total construction area of approximately 66500 square meters. It mainly includes A1~A6 # buildings, B1~B6 # buildings, basements, property management rooms, distribution rooms, water pump rooms, fire control rooms, garbage stations, and other projects. This includes 10 above ground floors and 1 underground floor of buildings A1~A6, with reinforced concrete shear wall structure; B1~B6 buildings have 3 floors above ground and 1 floor underground, with reinforced concrete shear wall structure; The basement has a building area of 11308.1 square meters, including a civil air defense basement of 4080.71 square meters. It is a reinforced concrete frame shear wall structure with one basement floor and two partial floors. 2.5 Scope of bidding: Review of all budget estimates for the Gulf Cloud Environment project, tracking and auditing of the entire construction process, and final settlement review (including on-site inspections, site visits, participation in project related meetings, activities, etc.), including but not limited to participating in design scheme and construction drawing optimization, drawing review, contract negotiation, engineering measurement, changes, visas, and claims; Prepare completion settlement reports and issue audit results reports for each stage, including weekly, monthly, and annual reports. When the relevant departments at the higher level conduct an audit of the project, they should cooperate well and submit relevant materials such as work papers for tracking the audit process as required (including cost control throughout the bidding preparation stage, design stage, construction stage, and engineering settlement review during the completion settlement stage). 2.6 Service period: 1095 calendar days, synchronized with the construction period, from project construction bidding to completion acceptance, the whole process is tracked and audited, and the completion settlement is audited. The project audit is completed with the progress of the project construction and a complete audit report is issued. All audit materials are handed over to the tenderer. 2.7 Maximum bidding price: 1.4115 million yuan, exceeding the maximum price will result in invalid bidding documents. Section 2.8 Division: One section. 2.9 Quality standard: Qualified. 3、 The qualification requirements for bidders in this bidding process are as follows: 3.1 The bidder should have the ability to independently enter into contracts and a valid business license; 3.2 Not in a state of being ordered to suspend business, having their bidding qualifications revoked, or having their assets taken over, frozen, or bankrupt; 3.3 The enterprise has not engaged in any illegal or irregular activities such as fraudulently winning the bid, serious breach of contract, or major engineering quality or safety production accidents,
View hidden content