天津(Design) Tianjin Development Zone FAW Volkswagen North China Base Construction PPP Project - Park Supporting Project

CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view

To view hidden content (*), please log in first

Construction Application Number: Tender Filing Number: 12192025046002 EPC Engineering General Contracting Tender Notice: Tianjin Development and Design Co., Ltd. [2025] 04021, Tender Conditions: This project is a PPP project for the construction of FAW Volkswagen North China Base in Tianjin Development Zone - Park Supporting Project. The project has been approved for construction by the Administrative Approval Bureau of Tianjin Economic and Technological Development Zone (Nangang Industrial Zone) with approval numbers of Jinkai Approval [2024] 11936 and Jinkai Approval [2025] 11120. The tenderer is Tianjin Development Zone FAW Volkswagen Base Development and Construction Co., Ltd. The construction funds are 250 million yuan, with bank loans of 200 million yuan and self raised and other funds of 50 million yuan. The funding source has been confirmed, and the construction scale is 15200 square meters. The project has met the bidding conditions. Tianjin Teda Engineering Technology Consulting Services Co., Ltd. has been commissioned by Tianjin Development Zone FAW Volkswagen Base Development and Construction Co., Ltd. to conduct an open bidding process for the general contracting of the project and select the preferred contractor. 2. Project Overview and Bidding Scope 2.1 Project Overview: Tianjin Development Zone FAW Volkswagen North China Base Construction PPP Project - Park Supporting Project, with a construction scale of 15200 square meters. It is a park supporting project on its own site, covering an area of 32100 square meters and a building area of 15200 square meters. Main construction content: Section 1: Park supporting public station and building project, new sub project names: Bus Terminal 1, Bus Terminal 2, Comprehensive Law Enforcement Management Building project, Police Station project, Employee Sports Stadium, Fire Station 2 project. The total area of the project is 32100 square meters, with a building area of 15200 square meters. Section 2: Supporting hot water pipeline network project for the park, with new sub project names: Host Factory Phase II Hot Water Pipeline Network Project, Component Enterprise Hot Water Pipeline Network Phase II Project. The total length of the project pipeline is 5000 meters, with a total investment of 250 million yuan. 2.2 Project Construction Location: Tianjin Development Zone FAW Volkswagen North China Base 2.3 Section Division and Bidding Scope: This bidding section is: Section 1: Section Name: Tianjin Development Zone FAW Volkswagen North China Base Construction PPP Project - Park Supporting Project EPC Engineering General Contracting, Bidding Scope: Park supporting public stations and buildings include the first and second bus terminals, comprehensive law enforcement management buildings, police station project, employee sports stadium, second fire station and other projects; The supporting hot water pipeline network project in the park includes the second phase hot water pipeline network project of the main engine factory and the second phase hot water pipeline network project of the component enterprise, with a total length of 5000 meters. The total area of the project is 32100 square meters, with a total construction area of 15200 square meters. The maximum individual area is 4730 square meters, the maximum span is 10.2 meters, and the highest height is 15 meters. Including but not limited to construction drawing design, completion drawing design, equipment and material procurement, decoration, heating pipeline network, park greening, factory roads, repair, transportation, storage due to construction damage, construction (including pile testing and foundation treatment), installation (civil engineering installation and process installation), project completion acceptance, filing, handover, project warranty, cooperation with relevant departments for auditing and other follow-up service work. Please refer to the recruitment for specific details
View hidden content