北京Design of Implementation Path for Off site Supervision of Water Affairs in Beijing

CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view

To view hidden content (*), please log in first

On April 8, 2025 at 00:00, our company publicly selected an intermediary service agency for the Beijing Municipal Water Affairs Bureau on the Beijing Intermediary Service Online Trading Platform. The relevant matters of the selected agency are hereby announced as follows: Project Number ZJ2025BJ1009613 Project Name Water Non site Supervision Implementation Road Design Intermediary Service Matters Other Investment Approval Project Scale Project Location (Beijing City District) Municipal Area Project Owner Beijing Municipal Water Affairs Bureau Owner Unit Contact Person Owner Unit Contact Number 01055522862 Service Content (Project Content) (1) Non site Supervision Policy Analysis and Research. Conduct research and analysis on the implementation of non site supervision work by the country, ministries, other provinces and cities, as well as different industries, and summarize and condense the application effectiveness and advanced experience of non site supervision work in different provinces, cities, and industries. (2) Construction of institutional framework for non site supervision of water affairs. Based on the management characteristics of the water industry, starting from the requirements and workflow of non site supervision work, a system framework for non site supervision work of water industry is constructed, and the key links of non site supervision, key work contents of different links, relevant systems and technical outputs are analyzed and proposed. (3) Design of non site supervision system for water industry in different fields. In response to the needs of non site supervision work and scenario construction in different fields of water affairs, we will carry out work system design, focusing on specific supervision matters in various fields of the water industry, clarifying job responsibilities, work points, work rules and procedures in each link, improving the non site supervision rule system in various industry fields, and forming a typical scenario non site supervision work guide. (4) Construction of off-site regulatory data collection and analysis model. In response to the regulatory needs of typical scenarios in different fields of water affairs, a data aggregation path is proposed through classification analysis of upstream and downstream data relationships, clarifying data governance methods, forming standardized datasets, and constructing data analysis models. (5) Design of a graded and classified management system for "credit+risk" in the water industry. Selecting mature scenarios to carry out the design of a "credit+risk" grading and classification management system, targeting specific regulatory entities, researching and proposing a grading and classification management system from the aspects of "credit+risk" evaluation standards, "credit+risk" rating evaluation, etc., and formulating differentiated regulatory measures for "credit+risk". (6) Policy recommendations for off-site supervision in the water industry. Based on the relevant policies and requirements of Beijing, combined with the management characteristics of the water industry and the actual situation of off-site supervision work, relevant policy suggestions are proposed to address the problems existing in the work. Source of Funds: Fiscal Funds Service Amount (RMB 10000) 94.73401 Transaction Method Comparison Service Time Limit: The time limit for intermediary service institutions to provide services. Selected on April 24, 2025, with a selected amount of 93.8468 yuan. Explanation of the selected intermediary institution: Beijing Institute of Water Science and Technology, selected institution address. Announcement of the selection results. Publicity period: 3 working days. Supervision telephone number
View hidden content