浙江Hangzhou Municipal Party School Xiaoshan Branch New Campus Construction Project Red Line Power Transformation and Distribution Engineering (Permanent Power)
CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view
To view hidden content (*), please log in first
Project Name: Hangzhou Municipal Party School Xiaoshan Branch New Campus Construction Project Red Line Transformation and Distribution Engineering (Permanent Electricity) Construction Unit (Bidder) Approval Document and Number/Main Construction Content: Two new substations will be built, including two 1250kVA transformers and supporting high and low voltage switchgear for Substation 1, and two 1250kVA transformers and supporting high and low voltage switchgear for Substation 2 (General High Voltage Distribution). Bidding Project Number Engineering (Section Name) Bidding Content Plan Bidding Time Estimated Contract Amount (RMB 10000) 1 Hangzhou Municipal Party School Xiaoshan Branch New Campus Construction Project Red Line Transformation and Distribution Engineering (Permanent Electricity) Construction Drawing Scope All contents within the scope of the construction drawing of the red line of the project 2022-05-27420.0 Related attachments: Click to download Remarks: This table is the bidding plan, and the final bidding announcement and bidding documents shall prevail. Print this page and close the window