陕西Xianyang Thermal Power Company Relay Pump Station Project
CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view
To view hidden content (*), please log in first
1. Bidding conditions: The relay pump station project of Xianyang Thermal Power Company in this bidding project has been approved for construction by the Qinhan New City Management Committee of Xixian New Area, Shaanxi Province at 2407-611204-01-945044. The bidder (project owner) is Xianyang Thermal Power Company, and the construction funds are self raised. The project contribution ratio is 100.00% of state-owned funds. The project has met the bidding conditions and is now open for bidding. Potential bidders (hereinafter referred to as applicants) who are interested are invited to submit pre qualification applications. 2. Project Overview and Bidding Scope 2.1 Construction Location: North of Lanchi 3rd Road, Qinhan New City, west of Yinxi High speed Railway, and south of Freight North Ring Line; 2.2 Project Scale: A new relay pump station will be built with a land area of 3490 square meters and a building area of 1603.62 square meters. It will be equipped with a relay pump station room, high and low pressure distribution rooms, and supporting facilities. The project will adopt a semi underground frame structure, with a design pressure of 1.6 MPa and a supply and return water temperature of 130/70 ℃; 2.3 Total project investment: 42500000 yuan (including an estimated 42500000 yuan for this bidding project); 2.4 Planned construction period: 100 calendar days; 2.5 Section division: Section 1: Section name: Construction of relay pump station project of Xianyang Thermal Power Company; Section number: E6112003509f75grp4jy001; Section type: Construction; Section 2: Section Name: Xianyang Thermal Power Company Relay Pump Station Engineering Equipment Installation Project; Section number: E6112003509f75grp4jy002; Section type: Construction;; 2.6 Bidding Scope: Section 1: Construction of a new relay pump station with a land area of 3490 square meters and a building area of 1603.62 square meters, including a relay pump station room, high and low voltage distribution rooms, and supporting facilities. Section 2: Construct a new relay pump station with a land area of 3490 square meters and a building area of 1603.62 square meters. Install equipment such as a relay pump station room, high and low voltage distribution rooms, and supporting facilities.; 2.7 Other:/. 3. Qualification Requirements for Applicants 3.1 Section Name: Construction of Xianyang Thermal Power Company Relay Pump Station Project: This pre qualification review requires the applicant to have the qualification of "Construction Engineering General Contracting Level III" or above, and to have corresponding construction capabilities in personnel, equipment, funds, etc. Among them, the bidder intends to appoint a project leader who possesses the qualification of a second level registered construction engineer and above, as well as a certificate of safety production assessment (Construction B certificate), and is registered in the unit and has not served as the project leader of other ongoing construction projects.. Section Name: Xianyang Thermal Power Company Relay Pump Station Engineering Equipment Installation Project: This qualification pre-approval requires applicants to have the qualifications of "Mechanical and Electrical Engineering Construction General Contracting Level 2" or above and "Special Equipment Installation, Renovation and Maintenance License (Pressure Pipeline) GB2 Level" or above, and to have corresponding construction capabilities in terms of personnel, equipment, funds, etc. Among them, the bidder intends to appoint a project leader who possesses the professional qualification of "Registered Constructor of Mechanical and Electrical Engineering Level 1" or above, as well as a certificate of qualification for safety production assessment (Construction Safety B Certificate), and is registered in this unit