陕西Pre Qualification Announcement for EPC (Engineering, Procurement, and Construction) of the North Third Ring Road Pedestrian Walkway Improvement Project

CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view

To view hidden content (*), please log in first

1. Bidding conditions: The EPC (Engineering, Procurement, and Construction) of the North Third Ring Pedestrian Walkway Upgrading and Renovation Project has been approved for construction by the Xi'an Economic and Technological Development Zone Management Committee under document No. [2025] 11. The project owner is the Xi'an Economic and Technological Development Zone Public Project Construction Management Center, and the project funds come from a state-owned holding project. The project investment ratio is/. The bidder is the Xi'an Economic and Technological Development Zone Public Project Construction Management Center, and the bidding agency is Shaanxi Zhongrui Zhi Project Management Co., Ltd. The project has met the bidding conditions and is now open for bidding. 2. Project Overview 2.1 Project Scale: This project starts from Chongfu Road in the west and ends at Longshuo South Road in the east. The south auxiliary road is about 4.5 kilometers long and the north auxiliary road is about 3.7 kilometers long. The single red line width is 20 meters, mainly involving the renovation of sidewalks and road ancillary facilities. Total investment of the project: 22.0686 million yuan; 2.2 Project Location: The project is located from Chongfu Road in the west to Longshuo South Road in the east; 2.3 Total project investment: 22068600 yuan; 2.4 Section Division: Section Name: EPC (Engineering, Procurement, and Construction) of the North Third Ring Road Pedestrian Walkway Upgrading and Renovation Project; Lot number: E6101003506f3HTepIyK001; Section type: Engineering general contracting; 2.5 Bidding Scope: Section Name: EPC (Engineering, Procurement, and Construction) of the North Third Ring Road Pedestrian Walkway Upgrading and Renovation Project, EPC (Engineering, Procurement, and Construction) of the North Third Ring Road Pedestrian Walkway Upgrading and Renovation Project. The bidding scope includes all construction tasks such as construction drawing design, engineering construction, completion acceptance, and defect repair and warranty work during the engineering warranty period of this project. At the same time, it undertakes related preliminary preparation, coordination, engineering related work, and follow-up service coordination work. The specific details shall be subject to the bidding documents; 2.6 Other: The construction agency for this project is Xi'an Economic Development Investment and Construction Comprehensive Bonded Zone Industrial Development Co., Ltd. The construction period is 90 calendar days, and the construction has not yet started. The bidding conditions have been met. 3. Qualification Requirements for Applicants 3.1 Section Name: EPC (Engineering, Procurement, and Construction) of North Third Ring Pedestrian Walkway Improvement Project. This pre qualification review requires applicants to have a comprehensive qualification of Class A or above for engineering design and Class III or above for municipal public works construction general contracting, or Class B or above for municipal industry engineering design and Class III or above for municipal public works construction general contracting, or Class B or above for municipal industry (excluding gas and rail transit) and Class III or above for municipal public works construction general contracting, and to have corresponding abilities in personnel, equipment, funds, and other aspects. Among them, the bidder intends to appoint a project manager with the qualifications of Registered Architect Level 2 or above, Registered Constructor Level 2 or above, or Registered Public Equipment Engineer or above, who has not served as the general contracting project manager or construction project leader for other ongoing projects. The applicant intends to appoint the project manager for the general contracting of the project, as well as the design project leader or construction project leader, who may be the same person, but must meet their qualification requirements at the same time. Section 3.2: North Third Ring Pedestrian Road Lifting and Renovation Project EPC. This qualification pre examination accepts the application for joint venture qualification pre examination. The application for pre qualification of a consortium shall meet the following requirements:
View hidden content