陕西Pre qualification Announcement for the Landing Project of the Electric Overhead Line of the Red Flag Railway Special Line Area Renovation Project (Red Flag Railway Park)

CODE
Click to view
Amount
Click to view
Bidding Unit
Click to view
Bidding TEL
Click to view
Agency
Click to view
Agency TEL
Click to view

To view hidden content (*), please log in first

1. Bidding conditions: The power overhead line landing project of the Hongqi Railway Special Line Area Renewal and Renovation Project (Hongqi Railway Park) has been approved for construction by the Development and Reform Commission of Weiyang District, Xi'an City with the approval of No. [2025] 13. The project owner is the Housing and Urban Construction Bureau of Weiyang District, Xi'an City. The project funds come from a state-owned holding project, and the project investment ratio is 100.00% of state-owned funds. The bidder is the Housing and Urban Construction Bureau of Weiyang District, Xi'an City, and the bidding agency is Shaanxi Longxin Project Management Co., Ltd. The project has met the bidding conditions and is now open for bidding. 2. Project Overview 2.1 Project Scale: (1) For the section from Baihulin Road to Hanyuan Road, a new 3x3 cable protection pipes with a diameter of 200/7WPFCT will be laid along the red line on the east side of the park, and the power ducts will be sealed with concrete, totaling 298 meters; (2) A new 1.8x2.0 meter reinforced concrete power pipe trench will be built for the laying of 110kV and 10kV power cables on the section from Hanyuan Road to Taikang Road (a 2.0-meter diameter Grade III reinforced concrete pipe will be used for top-down construction, with a length of L=87 meters), with a total length of 1261 meters. There are one top pipe well and one working well, with a net size of 6.0x8.0 meters for the top pipe working well; One receiving well with a net floor area of 6.0x6.0 meters. The top pipe working well and receiving well are both constructed with reinforced concrete structures using the reverse construction method. (3) Construction of 4x5 φ 200/7WPFCT cable protection pipes with 10kV power cables for the Taikang section to the North Second Ring Road section; The power duct is enclosed in concrete, with a total length of 1233 meters. (4) 2x3 new cable protection pipes with a diameter of 200/7WPFCT will be built on the section from Second Ring Road North to Yongming, and 10kV power cables will be laid; The power duct is sealed with concrete, totaling 228 meters. (5) Dismantle all overhead power lines (including poles and high-voltage iron towers) in Hongqi Railway Park, lay 110kV and 10kV power cables in the new power channel, and install equipment such as box transformers and ring main units. The total length of 110kV cable laying in this project is about 10800 meters, and the total length of 10kV cable laying is about 11718 meters; 2.2 Project Location: The project is located on both sides of the original Hongqi Railway Dedicated Line; 2.3 Total project investment: 71579700 yuan; 2.4 Section Division: Section Name: Hongqi Railway Special Line Area Renewal and Renovation Project (Hongqi Railway Park) Power Overhead Line Landing Project; Lot number: N6101123506AUis6u8zt001; Section type: Engineering general contracting; 2.5 Bidding Scope: Section Name: Hongqi Railway Dedicated Line Area Renewal and Renovation Project (Hongqi Railway Park) Power Overhead Line Landing Project, Section Name: Hongqi Railway Dedicated Line Area Renewal and Renovation Project (Hongqi Railway Park) Power Overhead Line Landing Project; The scope of this bidding is the design, procurement, and construction of the power overhead line landing project for the renovation and renovation of the Hongqi Railway Special Line area (Hongqi Railway Park), until the completion and acceptance are qualified, as well as the defect repair and warranty work during the project warranty period, and to undertake related coordination work. Specific internal
View hidden content